Laserfiche WebLink
• MEMO TO: Mounds View Parks and Recreation Commission <br /> FROM: Staff <br /> DATE: May 23 , 1984 <br /> SUBJECT: Bid Proposals for Random Park <br /> Staff received five bid proposals that met specifications for <br /> playground equipment at Random Park . The bid proposals range <br /> from a low of $6 , 845 from Builders Engineering Company to a <br /> high of $10 , 800 from Homily Recreations Company. Staff was <br /> unable to copy each of the design forms that were submitted <br /> as a number of them were on 24" x 36" copy. I will have them <br /> available with colorc _1 pictures at Thursday evenings Park <br /> Commission Meeting . <br /> In addition to the five bid proposals I have included a copy <br /> of the Playgrounds for the 21st Century which will give you an <br /> idea of the philosophy and concepts that are currently being <br /> discussed in professional journals regarding playground equipment <br /> and its role in society. <br /> 4111 The Staff at this time has no recommendation regarding the <br /> equipment for Random Park other than indicating that we had <br /> a total of $8 , 000 budgeted for the equipment and there is a <br /> possibility of an additional $1, 500 that could be allocated <br /> towards this project . All the equipment proposals are fairly <br /> similar and they meet the basic criteria that were drafted by <br /> the Park Commission to include slides, platforms, and a variety <br /> of related apparatus . <br /> Should you desire to review the formal designs prior to Thursday' s <br /> Commission Meeting feel free to contact myself directly at 784- <br /> 3055, Ext. 41 . <br />