Laserfiche WebLink
• <br /> Playground Clearing House, Inc. <br /> 26 Buckwalter Road <br /> !� s Phoenixville, Pa. 19460 <br /> 4.1111147AIL 215 <br /> 935 1549 <br /> 12 April 82 <br /> Lambert Park <br /> Mounds View, MN <br /> The following nine items are recommended for installation <br /> in Lambert Park. Effort has been made to recycle at least <br /> 44 poles by readapting them to different structures . <br /> A . Super Tire . For an entrance to Lambert , A large off-the- <br /> road tire is recommended . The tire should be at least size <br /> 30 .00 x 35 .00. They are available free , including delivery <br /> from large contractors, heavy machinery dealers or stone <br /> quarries . Mounds View must dig the hole prior to arrival <br /> of the tire . Makes sure it is a good tire with no ragged <br /> edges or blowouts which can not be hidden by burial . If <br /> a back hoe is used to dig and refill the hole , only two <br /> or three man hours are required. <br /> B. The 20 ' + utility pole with two three- foot sections for <br /> supports can be obtained free from the utility companies . <br /> New and treated the materials would cost about $75 .00 . They <br /> are connected by steel pipe or re-rods about 3/4" x two <br /> feet long. Labor time approx 4 manhours . <br /> C . The pole walk of eight to twelve poles are sunk 1/3 <br /> their height into the ground. Labor for twelve poles is <br /> about three hours . Make sure to chamfer the edges . <br /> D . "A" Frame. The old poles may be used in this new use . <br /> The round edges should be flattened where they meet with <br /> the upright poles . They can be lagged in from the back <br /> with Z x 6" lag screws . The top joint should be bolted <br /> with 2 x 10" bolts (counter sunk) . Labor 6 hours , hardware <br /> costs - $10. 00 <br /> E . Tire tunnel of four to six farm tractor tires . Bolted <br /> at the 10 & 2 o ' clock positions with 3/8" x 3" all thread <br /> bolts . Install rubber conveyor belting from a point 2 ' on <br /> either end past the tunnel . Anchor with flush-set railraod <br /> tie units . This prevents scuffed knees and pants and elim- <br /> inates mud puddles . Cost - a few dollars for bolts . Labor <br /> to dig ditch and bolt tires about six hours . Can be <br /> assembled before hand and taken to job site . <br /> F . Two tier log platform to be made from recycled logs . <br /> 41/1 Need four dozen + ?" x 10" bolts . Heavy duty drill , chain <br /> saw, etc. Labor time about twenty hours . <br /> G . Tree House/Sliding board. If double platform is used . <br /> lumber requireement is 12 4" x 4" x 12 ' long pressure <br /> treated boards and about 350 board feet of 2" x 6" pressure <br /> treated lumber, 1 sheet of stainless steel "B" Finish 4 ' x 8 ' , <br />