My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4-28-83 Agenda & Packet
MoundsView
>
City Commissions
>
Parks, Recreation & Forestry
>
Packets
>
1980-1989
>
1983
>
4-28-83 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2023 3:21:40 PM
Creation date
5/4/2023 3:00:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mounds View = 2 <br /> G - 2 pieces galvanize steel pipe 12" i . d. bent and welded <br /> 1111 to sheet . Allow two extra feet at bottom to attach rubber <br /> stop mat . Also needed 250 5/16" x 3" galvanised lag screws , <br /> 12 galvanized carriage bolts , 3/8" x 3" and 24 carriage <br /> bolts (also galvanized) 3/8" x 6" to bolt skirts on posts . <br /> Also 20 ' of h . d . 3/8" galvanized chain plus chain anchor <br /> plates as shown on page 45 of Nuts & Bolts . <br /> H Cable glide. Need two poles approx 8-10" by 14 ' long. <br /> Should be set with auger truck and well tamped after setting. <br /> Need one cable glide as made by PCH, 25 ' h . t .s . steel cable <br /> 5/16" in diameter, 2 5/8" eye bolts x 12" long. Must be <br /> welded shut , no mechanical closures on eye bolts . Need <br /> cable grip or come-along to tighten cable . Need half dozen <br /> 5/16" cable clips ( "U" bolts ) to attach cable to eye bolts <br /> etc. <br /> I Triple Swing - need three 25 ' x 8 - 10" poles set in <br /> ground as shown on plan . Need 3 sets 1" threaded rods -30" <br /> long with 6 washers and six nuts to tie three poles together . <br /> Need three sets o.f PCII Universal swivels plus approx 60 ' <br /> 5/16" coil proof chain (galvanized) plus three good tires , <br /> and three sets of carriage bolts (gal) 3/8" x 2" plus extra <br /> size sets of washers to prevent "pull through" . <br /> Tools needed Auger truck <br /> Back Hoe <br /> Chain Saw <br /> H. D. Electric drill with bits up to 1" x 24" <br /> ( I can bring these along) <br /> Post hole diggers , rakes, shovels , wheel- <br /> barrows , carpenters tools , hack saw, etc. <br /> Electric power <br /> I agree to provide all the supervision for the sum of <br /> $1,250 plus expenses . I can bring along a few tools such <br /> as electric drill (Very heavy duty ) . I will arrive on a <br /> Thursday evening and prepare to work Friday , Sat and most of <br /> Sunday . <br /> Sincerely , <br /> Q-I) <br /> Paul Hogan <br />
The URL can be used to link to this page
Your browser does not support the video tag.