Laserfiche WebLink
MaU_NDitSVVfE_W <br />of Mounds View Staff R <br />Item No: 03 <br />Meeting Date: April 3, 2023 <br />Type of Business: Work Session <br />City Administrator Review: <br />To: Honorable Mayor and City Council <br />From: Jon Sevald, Community Development Director <br />Item Title/Subject: Sign Ordinance <br />Introduction: <br />During the February 6th City Council Work Session, the Council discussed the Sign Ordinance, <br />directing Staff to prepare an amendment increasing Wall Signs, from 100 sq ft per business to <br />and to allow rooftop signs. Staff has not had an opportunity to draft an amendment. <br />Therefore, the purpose of this item is to further discuss the intent of regulating signs, and design <br />standards along the Mounds View Boulevard corridor. <br />Staff's "quick answer" is to increase Wall Signage from 100 sq ft to 200 sq ft, and keep <br />everything else the same (end of report). But, for further reading...... <br />Discussion: <br />The February Work Session discussion is in response to the Bear Lot expressing a desire to <br />triple their signage (including an iconic bear on the roof). The February 6th Staff Report <br />compared Mounds View sign regulations to other cities with corridors similar to the Boulevard, <br />finding many methods of calculating maximum sign area. But, the comparable results for the <br />Bear Lot is that Mounds View would be consistent with other cities if we increased Wall Signs <br />from 100 sq ft to 200 sq ft, but also consistent if we continued to prohibited Wall Signs from <br />being larger than the Wall (e.g. no rooftop signs). Does the Council want to permit rooftop <br />signs (e.g. the Mermaid)? <br />Regulation 2022 <br />Allowed at The Bear Lot <br />Ground Sin <br />Wall Sin <br />Ground Sign <br />Wall Si n <br />Area <br />Height <br />Area <br />Area <br />Height <br />Area <br />Arden Hills <br />100sf <br />16' <br />80sf <br />100sf <br />16' <br />80sf <br />Blaine <br />180sf <br />14' <br />10%' or 200sf, whichever smaller <br />180sf <br />14' <br />200sf <br />Coon Rapids <br />200sf <br />20'-36' <br />40sf or 10% up to 200sf <br />200sf <br />30' <br />200sf <br />Fridley <br />80sf <br />25' <br />15X of � wall length2 <br />80sf <br />25' <br />233.3sf <br />Mounds View <br />200sf <br />16' <br />100sf <br />200sf <br />16' <br />100sf <br />New Brighton <br />64sf <br />20' <br />40% of wall area, or 200sf <br />whichever smaller <br />64sf <br />20' <br />200sf <br />Roseville <br />200sf <br />25' <br />1.5sf /l sf of wall length <br />200sf <br />25' <br />363sf <br />Shoreview <br />50-150sf <br />10'-20' <br />5%-10% of wall area max 500sf <br />60sf <br />6' <br />424sf <br />White Bear <br />Lake <br />35sf <br />10, <br />Single -tenant: 10% of front wall <br />area + 5% of side wall area, not to <br />exceed 200 sq ft, based on size of <br />building. Single -Tenant: 7% of wall <br />area, up to 80 sq ft. <br />35sf <br />10, <br />200sf <br />The Bear Lot3 <br />229sf <br />26' <br />86'+215'+bear <br />Generally, the intent of signs is identification (here we are), and advertisement (what we have <br />for you). In recent months, Voice of Truth has installed an illegal second monument sign. The <br />North Church has expressed interest in increasing their wall sign from 93 sq ft, to larger than the <br />1 Front wall area (MV Blvd side) = 4,296sf area (source: p.A3.1 Building Elevations, Mar 6, 1998) <br />2 Wall length (MV Blvd side) = 242' (source) = p.A2.1 Floor Plan, Mar 6, 1998). Building height = 18' <br />3 Ground Sign #1 = 144.2sf area (permit #2017-00012), 26' ht (Res 5042). Ground Sign #2 & #3 = 2X 42.7sf. (Res <br />5042) <br />