Laserfiche WebLink
• <br /> MINUTES OF THE PROCEEDINGS OF THE <br /> PARKS AND RECREATION COMMISSION <br /> . CITY OF MOUNDS VIEW <br /> COUNTY OF RAMSEY <br /> STATE OF MINNESOTA <br /> March 14 , 1985 <br /> Mounds View City Hall <br /> Council Chambers <br /> 6 : 30 p.m. <br /> CALL TO ORDER The meeting was called to order at 6: 35 p.m. <br /> by Chairperson Wayne Burmeister . <br /> ROLL CALL Commissioners present : Chairperson Burmeis- <br /> ter; Commissioners Bowman , Weflen , Silvis, <br /> Long. <br /> Commissioners absent : Commissioners Linnel <br /> and Letendre . <br /> Councilmembers present: Councilmember Quick. <br /> Staff present : Parks and Recreation Director <br /> Anderson and Program Supervisor Saarion . <br /> GREENFIELD PARK Staff indicated that the purpose of the <br /> DEVELOPMENT special meeting was to review the final bid <br /> documents and specifications for Greenfield <br /> Park, as well as review the master plan draw- <br /> ings. Staff reviewed the process that had <br /> occurred to date in relationship with Barton- <br /> Aschmann and Associates and indicated that <br /> the project was still on schedule . Staff <br /> reviewed the changes in the park plan from <br /> the original concept plan which included the <br /> following: <br /> 1 . Due to space limitations, the baseball <br /> fields left and right foul lines were <br /> reduced 10 feet. <br /> 2. The grading plan was revised to reduce <br /> approximately 8 ,000 cu. yds. of fill. <br /> 3. The soccer field was lowered approximate- <br /> ly 6 inches to accommodate the revised <br /> grading plan . <br /> 4 . The estimated cost projections did not <br /> include three items: <br /> • A. Construction of the three bridges <br /> over judicial ditch #1 and #5. <br /> B. Contract for services with the engin- <br /> eering firm. <br /> C. Purchase of new playground equipment. <br />