Laserfiche WebLink
COST ANALYSIS <br /> III <br /> LOCATION: Ardan Park <br /> DATE: May 15, 1986 <br /> PREPARED BY : Bruce K. Anderson <br /> DESCRIPTION _ .LUANTITY UNIT MATERIAL LABOR TOTAL COST <br /> Unit Total Unit Total Unit Total <br /> Landscaping Sub $43,00C <br /> Detail Earth Berms 600 CY 11 $7,O0C <br /> Canopy Trees 150 A 100 $15,O0C <br /> Flowery Trees 70 A 50 $3,5OC <br /> Shrubs 60 A25 $1,50C <br /> Bicycle Path - <br /> 8' Asphalt 1 700LF 9 $16,O0C <br /> Picnic & Free- <br /> play sub <br /> Detail <br /> • 123,675 ft. ,$18,OOC <br /> Tables GT #8724 12 ea_ 200 $2,400 <br /> Grills GT #49 , 4 ea 150 $600 <br /> Shelter bldg - <br /> Miracle 120-301 1 1 CJ 1,000 4,000 $15,00C <br /> Play area sub $8,000 <br /> Steelville 3B 1 ea 7,000 $7,000 <br /> Timbers 1,000 800 $800 <br /> Sand 200 $200 <br /> Bike Posts L.S. 5 ea 35 40 17 $375 <br /> #31 — <br />