My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-28-86 Agenda & Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
1980-1989
>
1986
>
08-28-86 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 1:58:11 PM
Creation date
5/12/2023 1:36:35 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COST ANALYSIS <br /> LOCATION: Ardan Park <br /> DATE: May 15, 1986 <br /> PREPARED BY : Bruce K. Anderson <br /> DESCRIPTION QUANTITY UNIT MATERIAL _ LABOR TOTAL COST <br /> Unit Total Unit Total Unit Total <br /> Walking Path & <br /> sub Nature Stu y Area $71,00C <br /> Walking Path <br /> 5( Grand aq li e 1,400 if 1.33 $2,05q <br /> Nature Study <br /> Development- <br /> signage bird blind; <br /> observation kiosks _ _ $5,000 <br /> Horseshoe Pit sib _ $500 <br /> Clay & Sand mix 4 CY 50 $200 <br /> • Redwood edging _ <br /> 2" x 6" 96 if 2. 10 $200 <br /> Metal Posts 4 is 15 $60 <br /> Footing for Posts .2 CY 165 $40 <br /> Site Amenities ub $90,20C <br /> Trash Receptacles 7 ea 125 $800 <br /> Benches GT #4047 <br /> 8' 4 ea 125 150 $1,200 <br /> Parking: 430 2y 10 $4,300 <br /> Asphalt curfarn <br /> & base including <br /> earth work _______.__ L <br /> Stripping Stalls 7 ea 5 $35 <br /> Wheel Stops 7 ea <br /> Preparation cut 215 CY 3 $645 <br /> & fill _ _ - __ 0---- <br /> Pond <br /> —Pond Development <br /> • (80,000 ft) — — <br /> 800 CY 4 $32,0OC <br /> Special Soil 7,500 CY 4 $32,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.