My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-27-86 Agenda & Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
1980-1989
>
1986
>
02-27-86 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 1:58:11 PM
Creation date
5/15/2023 12:31:13 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-7- <br /> V. FUTURE AQUATIC AVENUES <br /> Looking into the second year of the Edgewood Pool devel<,i�- <br /> 1111 <br /> ment plans, one will see further emphasis on new advertisi , ; <br /> methods, to educate more local residents of the availability <br />. of the aquatic program. Organizational sponsorship <br /> involvement will be sought out by such groups as; The Art_L <br /> • <br /> ritic Foundation , Group Health Inc . and local corporate fit - <br /> ness programs. The School District-wide coordination wilt <br /> be expanded. A projected 1984 profit margin of approximat'J- <br /> ly $12,000 in surplus revenue will be recycled into addi -- <br /> tional pool improvements. Such projects currently bei , <br /> researched include the expansion of the pool gallery seatit' 1 <br /> capacity, outdoor "POOL" lettering for easier identificatit)n <br /> of the pool location, a new maxi-flex diving board , and ,A <br /> self-contained "turtle" pool cleaning system. <br /> The 1985 beach operation and procedures will basically <br /> remain the same , with the exception of a possible change ii, <br /> daily hours to better match the public ' s utilization of th,, <br /> facility (move beach hours up to 11:00 a.m. - 8:00 p.m. from <br /> the past season' s 12: 30 p.m. - 8: 30 p.m. ) . <br /> Physical structure improvements may include ( in order ,1 <br /> importance ) : <br /> 1. A new dock system - One of the two current docks was di ,. <br /> assembled two weeks prior to the close of the season t,,,F <br /> safety reasons. The new wooden docks could be made ih- <br /> ` • house at a reasonable rate . <br /> 2. A floating raft and lifeguard chair to be placed in thk. <br /> water. <br /> 3. Winterization and rental of the beach house structure . <br /> • 4. Development of a tribute to the members of the original <br /> Playground, Inc . and Lakeside Park Commission . Possibil- <br /> ities include a flag pool commemoration , gardens and sit- <br /> tiny area, as well as a permanent drinking fountain . <br />
The URL can be used to link to this page
Your browser does not support the video tag.