Laserfiche WebLink
Public Works Staff Report <br />Greenfield Park: <br />• Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the back <br />portion of the Park, added class 5 as needed. <br />• Commission will need to discuss at the August 2020, Green field baseball field. Take out all turf <br />from first and third base line and replace with Ag -lime to the fence. Most all new park <br />construction is going this way with ball fields. This would solve the wet home plate issue and <br />uneven base line issues. <br />• Building has been re -roofed <br />• Doggie pot dispenser repaired, lock was vandalized <br />• Tree debris removed from ditch behind batting cage <br />• Leaf mulching and removal <br />Hillview Park: <br />• . Commission will need to discuss at the August 2020, playground Rehabilitation. <br />• Furnace at Park Shelter has been replaced — condensing still needs to be installed. <br />• Bathroom locks repaired interior and exterior <br />• Hockey light checks and bulb replacements <br />• Leaf mulching and removal <br />• Glass replaced on North facing door due to vandalism <br />Lambert Park <br />• Inventory of Hockey Rink boards,posts and lights to re -place <br />• Exterior drinking fountain repaired, it was pulled loose from the building. <br />• Hockey light checks and bulb replacements <br />■ Leaf mulching and removal <br />Oakwood Park <br />0 Leaf removal and mulching <br />Random Park: <br />• Commission will need to discuss at the August 2020, playground Rehabilitation <br />• Carpets shampooed <br />• Playground plan review from St.Croix <br />• Leaf mulching and removal <br />31 Page <br />