Laserfiche WebLink
Public Works Staff Report <br />The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br />Current updates are in black text, and updates from the previous two month period are in grey. <br />Ardan Park <br />■ Working with Stantec Engineering on some drainage issues in the Park. Application to <br />perform some storm water pond maintenance was submitted to RCWD. <br />• Work to be scheduled for this winter — postponed at this time. Still working with contractor for <br />a date on completion. <br />• Work on ditch completed — some restoration needs to be finished. <br />• Leaf mulching <br />City Hall Campus: <br />• New Picnic Shelters are being built, will be ready for next season rental. <br />• Worked with plumber and vendor to winterize the splash pad. <br />• Installation of the New Picnic Tables started <br />• Wood chipped trees <br />• Irrigation system installation shop <br />• Leaf removal/ mulching <br />• Sun shade removal from the playground area <br />Splash Pad <br />• Testing will be in open the Weekend of May 29 <br />• New UV light unit installed — Staff working on the system to fine tune the new UV <br />system. <br />• Splash winterizing <br />• New sand filter quotes <br />• Installation of new sand filter April 2022 (already purchased) <br />• New tank filters installation upon start up spring 2022 <br />• New grill and ash receptacle installation summer 2022 <br />Groveland Park: <br />• Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court <br />• Working on tennis lights they are not working <br />• Tennis lights repaired breakers replaced <br />• Leaf mulching and removal <br />• New HVAC installation March of 2022 <br />21 Page <br />