My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-24-2022 Meeting Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2020-2029
>
2022
>
02-24-2022 Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 1:35:51 PM
Creation date
9/26/2023 1:45:14 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Staff Report <br />The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br />Current updates are in black text, and updates from the previous two month period are in grey. <br />Ardan Park <br />■ Working with Stantec Engineering on some drainage issues in the Park. Application to <br />perform some storm water pond maintenance was submitted to RCWD. <br />• Work to be scheduled for this winter — postponed at this time. Still working with contractor for <br />a date on completion. <br />• Work on ditch completed — some restoration needs to be finished. <br />• Leaf mulching <br />City Hall Campus: <br />• New Picnic Shelters are being built, will be ready for next season rental. <br />• Worked with plumber and vendor to winterize the splash pad. <br />• Installation of the New Picnic Tables started <br />• Wood chipped trees <br />• Irrigation system installation shop <br />• Leaf removal/ mulching <br />• Sun shade removal from the playground area <br />Splash Pad <br />• Testing will be in open the Weekend of May 29 <br />• New UV light unit installed — Staff working on the system to fine tune the new UV <br />system. <br />• Splash winterizing <br />• New sand filter quotes <br />• Installation of new sand filter April 2022 (already purchased) <br />• New tank filters installation upon start up spring 2022 <br />• New grill and ash receptacle installation summer 2022 <br />Groveland Park: <br />• Final Inspection of Punch list items on 10/25/2018 for Tennis/Basket Ball Court <br />• Working on tennis lights they are not working <br />• Tennis lights repaired breakers replaced <br />• Leaf mulching and removal <br />• New HVAC installation March of 2022 <br />21 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.