Laserfiche WebLink
Public Works Staff Report <br /> Ardan Park <br /> • 2nd ditch clean out fall 2023 <br /> City Hall Campus: <br /> • New grill installation on the West side of the West pavilion, summer 2023 <br /> • Removal of old portable bathroom enclosure 2023 <br /> • Construction of chemical closets on the North side of the splash pad building, foundation is <br /> complete, building the structure will start mid-June <br /> • Installation of more trash cans 2023 <br /> • Repair the drinking fountain near the old playground site 2023 <br /> • Splash pad electrical repairs and improvements <br /> • New irrigation pump installation booster station <br /> • Shelter shade install by 5-26 <br /> • Old big pavilion floor cleaning <br /> Groveland Park: <br /> • Grill and table repairs or replacements 2023 <br /> Greenfield Park: <br /> • <br /> Taking shipments on new playground components <br /> • <br /> Playground red tube repair <br /> • Playground removal 5-25-2023 <br /> • New playground install starting 5-30-2023 <br /> • New shelter install starting June 2023 <br /> • Ballfield lip removal <br /> • New pitching mound on order arriving mid-June <br /> Hillview Park: <br /> • Flooding and sweeping rinks daily <br /> • Playground rehabilitation needed 2024 <br /> • Hockey board painting 2023 <br /> 21 T' _ _ <br />