My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-2023 PRF Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2020-2029
>
ing)
>
09-28-2023 PRF Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 1:36:13 PM
Creation date
9/29/2023 12:27:27 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public Works Staff Report <br /> The following is the List of Parks and projects/maintenance activities ongoing or planned this year. <br /> Current updates are in black text, and updates from the previous two month period are in grey. <br /> Ardan Park <br /> • 2nd ditch clean out late fall 2023 <br /> • Pond meeting set up-tent, signs, tables, chairs and microphone. <br /> City Hall Campus: <br /> • New grill installation on the West side of the West pavilion, Spring 2024 <br /> • Splash starting winterization <br /> • Splash addition stain being applied fall 2024 <br /> • Repair the drinking fountain near the old playground site 2024 <br /> • Splash bathrooms, new toilet paper dispensers <br /> • Hand 2 dryers are ordered for both splash bathrooms installation Sept/Oct. 2023 <br /> • Un plugged main sewer line for splash pad <br /> Groveland Park: <br /> • Grill and table repairs or replacements 2023 <br /> • Start bird house install north side of park 9-30 (scout project) <br /> • New tables installed Sept 2023 <br /> • Playground chips added <br /> Greenfield Park: <br /> • New turf mound installed last month, replacing old turf mound. The new mound is rated for <br /> adult game and high school game play. The new mound has the same dimensions as the old <br /> mound. Metal cleats are not allowed like our previous mound. The baseball field is cut twice a <br /> week and game prepped for weekday games. <br /> • Land scape restoration ongoing <br /> • Merry go round, balance beam, rock wall and benches to be installed-October <br /> 21Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.