Laserfiche WebLink
MOUNDSIYIEW Trailways System Master Plan— DRAFT 7C <br /> Trailway Connections (Continued) <br /> Shoreview Connections <br /> The City of Mounds View currently has an established connection to Shoreview with the trail along County Road I. Another <br /> connection which could become a reality in the future is along County Road J. The City of Blaine has a right-of-way along the <br /> north side of County Road J. <br /> New Brighton Connections <br /> Trailway connections to the City of New Brighton are offered on along Long Lake Road and Silver Lake Road. Old Highway 8 <br /> provides opportunities to complete a connection to Long Lake Regional Park. <br /> Fridley Connections <br /> The City of Mounds View connects to the Fridley trailway system along County Road H, County Road H2 and County Road I. <br /> Spring Lake Park <br /> The trail way along Mounds View Blvd south is now complete from County Rd H to Spring Lake Rd. Additional trail way is <br /> needed from Spring Lake Rd to Pleasant View Dr to complete the connection along the entirety of Mounds View Blvd. A <br /> connection from the existing trail system to Lakeside Park is needed along Hillview Rd. <br /> Blaine Connections <br /> The trail way along the north side of Long Lake Rd, from Eastwood Rd to 93rd Ln, connects to Blaine's trail system. The future <br /> may offer opportunities to increase trail way linkages with Mounds View and Blaine on CR J. <br /> 5 <br />