Laserfiche WebLink
MOUNDS1YIEW Trailways System Master Plan DRAFT 7C <br /> City Hall Park SU • Connect existing trails to trail ways along MV Status:Complete—Paved trail from Edgewood Dr connecting to the Splash Pad, <br /> BLVD the baseball field,the small picnic pavilion,and ending at the sidewalk along the <br /> City Hall building/parking lot <br /> Gap:No controlled walk/bike features connecting existing park trail to trail way <br /> along MV BLVD <br /> Mowll I'ti,14)',<'0 hull(1wO 1N(Pp,,., i'/)U(l)`.1 ilg iilr t,'W)ritlg hull to (tali wuy along I1/IV <br /> 141 t/I) , ,'I''':'i Itlhl 10 Ilit 1i11Ot't lrl, 011 i)I,Ri for ADA 4 ompllunLe <br /> 4 .- "Ilw'; <br /> • <br /> de <br /> 4IP, 0111 -4 <br /> 14 A <br /> t.---L <br /> • <br /> Ns\#NININ44 4 , <br /> O <br /> 1 <br /> 4,61 <br /> Moundsview Dr SU • Connect existing trails to trail ways along MV Status:Concrete sidewalk along south side of Moundsview Dr existing from CR Ito <br /> BLVD Long Lake Rd <br /> Gap:No controlled bike features <br /> tn,,,,l ;,;1 <br /> 20 <br />