Laserfiche WebLink
MOUND'IEW Trailways System Master Plan—DRAFT 7C <br /> Detailed Plan - Continued <br /> Connector Prior <br /> Trailways Use -ity Connecting Landmarks and Trailways Status—Gaps- Plat„ <br /> Pleasant View Court SU • Connects to Arden Ave trailway and Status:Complete—Paved <br /> to Spring Lake Road neighborhoods Gap:NA <br /> t'i,r, lh,,,rt+r„ <br /> Arden Ave to Laport WW • Connects Groveland Park,Arden Ave trailway Status:Complete—Paved, narrow walkway <br /> Drive to neighborhoods Gap:NA <br /> {'ion Mainrcjui <br /> Arden Avenue to WW • Connect Arden Ave trailway to neighborhoods Status:Currently a worn foot path <br /> Sherwood Gap:Does not exist <br /> Plan Proposed trail way on west side at Red Oak Dr and proposed sidewalk on east <br /> ;:: from long lake Rd to Hillvrr <br /> P <br /> , <br /> 8 y. as <br /> sr an tu aata Sas mit' ttSXfta ate aasi ' taito as <br /> ill Us Ial*•-i.•a a at!ata' tt -IM!• aNIret aest Itas 4 sataII <br /> RED OAK DR <br /> et as . s mg a. a ..w. .a-ac as at .a as as . aas as . .1111 ,101/41111114211 at as . a• as as a as s a at as as as as =a a. a `t as a• <br /> 0 i <br /> ...... _ 7 - .1,, , 4 ......3 .,,, <br /> g,,d <br /> D <br /> 44. <br /> - <br /> Lois Lane to Knoll WW • Connects neighborhoods Status:Complete-Paved <br /> Drive Gap:NA <br /> i'lan.Maintain <br /> 21. <br />