My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2024/03/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2024
>
Agenda Packets - 2024/03/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:46:54 PM
Creation date
4/9/2024 1:22:19 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/11/2024
Supplemental fields
City Council Document Type
Packets
Date
3/11/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
January 26, 2024 <br />Don Peterson <br />Page 15 of 21 <br />Reference: Water Quality Assessment of Silver View Pond, Mounds View, MN <br />Figure 6. TP Loading by Subwatershed <br />BMP Design <br />Based on the subwatershed modeling, we developed BMPs to reduce TP loading to Silver View Pond. The <br />proposed BMPs are summarized below. <br />Forebay improvements: Improvements to the existing forebay include regrading to provide additional wet <br />pond storage along the south portion of the forebay with an iron -enhanced filtration bench on the north side, <br />as shown in Figure 7. The overflow berm is proposed to be regraded and an outlet control structure <br />installed, as shown in Figure 8. Runoff will enter the forebay with sediment settlement in the wet ponding <br />portion. The outlet control structure will be a 48" diameter structure with an inlet grate and a 12" outlet pipe <br />Design with community in mind <br />
The URL can be used to link to this page
Your browser does not support the video tag.