Laserfiche WebLink
January 26, 2024 <br />Don Peterson <br />Page 15 of 21 <br />Reference: Water Quality Assessment of Silver View Pond, Mounds View, MN <br />Figure 6. TP Loading by Subwatershed <br />BMP Design <br />Based on the subwatershed modeling, we developed BMPs to reduce TP loading to Silver View Pond. The <br />proposed BMPs are summarized below. <br />Forebay improvements: Improvements to the existing forebay include regrading to provide additional wet <br />pond storage along the south portion of the forebay with an iron -enhanced filtration bench on the north side, <br />as shown in Figure 7. The overflow berm is proposed to be regraded and an outlet control structure <br />installed, as shown in Figure 8. Runoff will enter the forebay with sediment settlement in the wet ponding <br />portion. The outlet control structure will be a 48" diameter structure with an inlet grate and a 12" outlet pipe <br />Design with community in mind <br />