Laserfiche WebLink
January 26, 2024 <br />Don Peterson <br />Page 16 of 21 <br />Reference: Water Quality Assessment of Silver View Pond, Mounds View, MN <br />to a downstream depressional area, which then discharges through a large corrugated metal pipe to Silver <br />View Pond. The secondary outlet will be filtration through the bench to a draintile which then discharges to <br />the outlet control structure. A 10-foot wide emergency overflow notch will be graded into the existing <br />overflow berm. Turf reinforcement matting will be added to the downslope down to the existing depressional <br />area. <br />NVVL 89T.D <br />EL 696.0 <br />EL 8950 <br />Figure 7. Forebay Improvements Cross Section. <br />Figure 8. Forebay Improvements Plan. <br />Design with community in mind <br />E.L 896.0 <br />--6" HOPE CORRUGATED <br />PERFORATED DRAINTILE <br />W IT1400T SOCK @ 01 % <br />GRADE <br />-FINE FILTER MEDIA <br />d <br />