My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2024/04/22
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2020-2029
>
2024
>
Minutes - 2024/04/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 9:24:15 AM
Creation date
6/11/2024 1:30:39 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
4/22/2024
Supplemental fields
City Council Document Type
Minutes
Date
4/22/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council April 22, 2024 <br />Regular Meeting Page 8 <br /> <br />on how to proceed. Staff recommended another quotes be pursued for this project and that the <br />current project be closed out with T.A. Schifsky. <br /> <br />The Council supported staff pursuing another quote for this work. <br /> <br />Mayor Lindstrom stated he supported the City fixing the problem rather with Schifsky’s or another <br />vendor. He believed the quote provided by Schifsky’s was abnormally high. He supported staff <br />pursuing another quote. He asked if staff could have another quote by May 6. Public Works/Parks <br />and Recreation Director Peterson anticipated he could have another quote by this date. <br /> <br />Mayor Lindstrom explained there were several different issues with this project. He stated there <br />were driveways that have bad concrete that were conforming that need to be replaced, then there <br />were driveways that were under warranty that were non-conforming that need to be replaced, and <br />then there were driveways that were non-conforming that need to be brought up to code. He <br />reported if the City were to receive another quote, the City could proceed with the quote they have <br />to close this project out with a single vendor. He questioned when the City would be <br />communicating with the neighborhood. Public Works/Parks and Recreation Director Peterson <br />stated the contractor has indicated the concrete work would be done in two to three weeks. He <br />reported if the Council considers this matter at their May work session meeting, a neighborhood <br />meeting could be held later that same week. He did not advise holding a neighborhood meeting <br />until the Council knows for sure what is happening. <br /> <br />Further discussion ensued regarding the concrete curb warranty work. <br /> <br />Vince Meyer commented on how his driving ability will be impacted if only one extension were <br />installed on his driveway. He questioned why his driveway was not installed in a manner that <br />conformed with City Code. He expressed concern with the fact the City would now have to pay <br />for somebody else’s mistake. He indicated his current driveway was only 11 feet wide. He stated <br />his previous driveway flared out 15 feet and he would like it to be replaced in the same manner. <br /> <br />Mayor Lindstrom believed the proper action would be to table or deny action on Resolution 9913. <br />City Attorney Riggs recommended the Council postpone action on this Resolution. <br /> <br />MOTION/SECOND: Meehlhause/Gunn. To Postpone action on Resolution 9913, directing staff <br />to seek another quote for the driveway alteration work for the 2022/23 Street Project. <br /> <br /> Ayes – 5 Nays – 0 Motion carried. <br /> <br />9. REPORTS <br />A. Reports of Mayor and Council. <br /> <br />Council Member Gunn stated she attended an airport commission meeting and the group discussed <br />holding a virtual tour of the airport this year. She explained the noise complaints from the previous <br />year would be posted on the City’s website. <br />
The URL can be used to link to this page
Your browser does not support the video tag.