Laserfiche WebLink
Public Works Staff Report <br /> The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br /> Current updates are in black text, and updates from the previous two month period are in grey'. <br /> Ardan Park <br /> • 2nd ditch clean out fall 2023 <br /> City Hall Campus: <br /> • New grill installation on the West side of the West pavilion, summer 2023 <br /> • Splash repairs <br /> • New addition interior work and installations <br /> • Camera repairs <br /> • Splash addition stain being applied fall 2023 <br /> • Repair the drinking fountain near the old playground site 2024 <br /> • New playground chips installed <br /> • Splash bathrooms, new toilet paper dispensers <br /> • Hand 2 dryers are ordered for both splash bathrooms installation Sept/ Oct. 2023 <br /> • New playground chips added <br /> • Un plugged main sewer line for splash pad ( <br /> Groveland Park: <br /> • Grill and table repairs or replacements 2023 <br /> • New tables installed Sept 2023 <br /> • Playground chips added <br /> Greenfield Park: <br /> • Sallfield lip removal done June 2023 <br /> • New pitching mound on order arriving next week <br /> • New turf mound installed last month, replacing old turf mound. The new mound is rated for <br /> adult game and high school game play. The new mound has the same dimensions as the old <br /> mound. Metal cleats are not allowed like our previous mound. The baseball field is cut twice a <br /> week and game prepped for weekday games. <br /> • Land scape restoration ongoing <br /> • Merry go round, balance beam, rock wall and benches to be installed —August/ September <br /> 21 Page <br />