My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-04-2023 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
12-04-2023 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:28 PM
Creation date
7/10/2024 10:24:46 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/4/2023
Supplemental fields
City Council Document Type
Packets
Date
12/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Design and construction <br />Based on public meeting comments, will review existing and proposed HWL in ponds relative to <br />adjacent properties <br />Have original grading plan for ponds. Will compare with field bathymetry. Probably restore to <br />original grading plan. <br />Need to determine access point(s). Kellie will discuss with Don Peterson. <br />Will finalize 60% construction plans for review with City <br />Will prepare specifications using Mounds View template. <br /> <br />Upland vegetation management plan to be prepared following review of upland <br />recommendations memo <br /> <br />Silver View Strom Water Pond: <br /> <br />Data collection <br />In-pond veg surveys are done <br />Sediment coring is done. Sediment needs to be hauled to landfill. <br />Water quality sampling is done <br />Upland vegetation summary memo was completed and reviewed with Don Peterson <br />Wetland delineation field work was completed. Report expected shortly so TEP can get out and <br />review. <br />Field survey is scheduled to be completed in the next couple of weeks, with a focus on potential <br />BMP locations <br /> <br />Public engagement <br />Mtg #1 was held on Thursday, 9/21, 5 pm. Meeting summary was submitted to Don <br />Mtg #2 to be held after preliminary plans and concepts complete <br /> <br />Take the recommendations to the Park Commission early 202, before going to the City Council <br /> <br />Have the second public meeting at a City Council meeting, early 2024 <br /> <br />Permitting <br />Wetland permitting will be prepared as needed, subject to BMP selection <br />Alum treatment submittal (if needed) will be prepared and submitted to MPCA <br /> <br />Water quality assessment and watershed analysis o Based on public meeting comments, will <br />review existing and proposed HWL in ponds relative to adjacent properties <br />Preliminary analysis of water quality and sediment data and pond modeling have been <br />performed, indicating majority of phosphorus loading is from the watershed and not internal <br />loading <br />Aquatic plant data has been assessed, showing primarily coontail and water lilies. Based on this <br />result, we may not be allowed to remove the water lilies or coontail, as they are not non-native. <br />We will follow up with the MnDNR on this, after which we will discuss with Don Peterson. <br />P8 modeling has been performed <br /> <br />Technical memo still needs to be prepared. It will cover: <br />Data collection, analysis and modeling, results and recommendations <br />Alum dosing, Aquatic plant community management, Spot dredging <br />BMP recommendations – structural and non-structural (within park setting) <br /> <br />Mapping <br />Upland vegetation recommendations memo not yet started. Will be based on City review of <br />summary memo and public input. Will develop high-level recommendations and cost estimates. <br />Will then review with Don Peterson. <br />
The URL can be used to link to this page
Your browser does not support the video tag.