My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway proposal 4-11-06
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2006
>
04-27-2006
>
Gateway proposal 4-11-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 2:14:41 PM
Creation date
8/21/2024 3:00:21 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr- Greg Lee April 11, 2006 <br />City of Mounds View, MN page.2 <br />2.0 Scope of Feasibility Report Services <br />The scope of Feasibility Report Services for the three separate gateway monument projects is shown <br />below, <br />Southeast Entry Sign <br />I. Visit the entry sign location site, as necessary, with the purpose of investigating, assessing and <br />documenting the existing conditions of the site, <br />2. Prepare schematic layout plans for entry sign. <br />3, Prepare schematic section — elevations for entry sign. <br />4, Prepare schematic structural review and schematic design of entry sign foundation. <br />5.. Prepare schematic electrical review and schematic design of entry sign lighting. <br />6. Coordinate schematic design of water feature at entry sign. <br />7, Gather product literature and information as necessary to support the schematic design of the <br />entry sign. <br />& Prepare preliminary costs for, design/engineering, construction, construction administration, and <br />contingency. <br />9. Prepare narrative and compile information for delivery to City. <br />Civic District Gateway <br />1. Visit the gateway location site, as necessary, with the purpose of investigating, assessing and <br />documenting the existing conditions of the site. <br />2, Prepare schematic layout plans for gateway monument. <br />3. Prepare schematic section — elevations for gateway monument. <br />4. Prepare schematic structural review and schematic design of gateway monument foundation. <br />5. Prepare schematic electrical review and schematic design of gateway monument lighting. <br />6� Coordinate schematic design of water features in existing pond. <br />7. Gather product literature and information as necessary to support the schematic design of the <br />gateway monument. <br />8. Prepare preliminary costs for design/engineering, construction, construction administration, and <br />contingency. <br />9. Prepare narrative and compile information for delivery to City. <br />Northwest Entry Sign <br />1, Visit the entry sign location site, as necessary, with the purpose of investigating, assessing and <br />documenting the existing conditions of the site. <br />2. Prepare schematic layout plans for entry sign. <br />.3. Prepare schematic section — elevations for entry sign. <br />4, Coordinate schematic structural review and schematic design of entry sign foundation. <br />5. Coordinate schematic electrical review and schematic design of entry sign lighting. <br />6. Gather product literature and information as necessary to support the schematic design of the <br />entry sign. <br />7. Prepare preliminary costs for design/engineering, construction, construction administration, and <br />contingency. <br />&, Prepare narrative and compile information for delivery to City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.