Laserfiche WebLink
Mr Greg Lee April 11, 2006 <br />City of Alow►ds View, MN Page 4 <br />Supplemental Design Services, Sections 3.0 and 4,0 will be billed on an hourly basis, according to our <br />current Hourly Rate Schedule on file with the City. A copy of the 2006 Rate Schedule is included with <br />this letter for your convenience. <br />We anticipate the additional survey needed for the feasibility report will require fees in the range of <br />$2200 to $2500. <br />Soil borings will be accomplished through a direct contract between the City and the geotechnical firm, <br />although Bonestroo will coordinate the contract process and the work of the geotechnical firm. We <br />anticipate the cost for performing soil borings will be approximately $1500, assuming shared <br />mobilization costs with other ongoing projects within the County Road 10 corridor. <br />6.0 Standard Terms and Conditions <br />The Standard Terms and Conditions set forth in the current Professional Services Agreement are <br />incorporated in this agreement. <br />7.0 Schedule <br />It is our- understanding that this proposal for the Feasibility Report for the three gateway monuments <br />will be presented to the Park and Recreation Commission at their meeting of April 27, 2006. If <br />acceptable, it is anticipated that it will proceed to the City Council at their, meeting of May 8, 2006 for <br />consideration of authorization. If this Report is authorized, we would begin the work immediately on <br />the portions for the Southeast Entry Sign and the Civic Gateway Monument projects as directed by the <br />City. Work on the portion for the Northwest Entry Sign would not be started until the City has <br />informed us of their final preferred location for- the sign and directed us to proceed. <br />The soil borings for all three monument sites may coincide with soil borings to be conducted for other <br />ongoing projects along the corridor (ie.. Trail Segments 9 & 10 Feasibility Report) to minimize costs. <br />Assuming the Report is authorized by the City Council on May 8, 2006, and a location has been <br />determined for the Northwest Entry Sign by May 15, 2006, it is anticipated that the Feasibility Report <br />for all three projects will be completed for consideration by the City Council on July 24, 2006. <br />8.0 City Responsibilities <br />This proposal for design services has been prepared based upon the understanding that the City will <br />have assumed the responsibilities in regard to the Project as described in Appendix C of our, current <br />Professional Services Agreement. <br />