Laserfiche WebLink
Public Works Staff Report <br /> 1110 <br /> The following is the List of Parks and projects/ maintenance activities ongoing or planned this year. <br /> Current updates are in black text, and updates from the previous two month period are in grey. <br /> Ardan Park <br /> • 2nd ditch clean out early winter/fall 2025 <br /> City Hall Campus: <br /> • New grill installation on the West side of the West pavilion, summer 2024 <br /> • Repair the drinking fountain near the old playground site 2024 <br /> • Stain building July 2024 <br /> • Ball field checks and field leveling <br /> • Splash Pad controller updates <br /> • Several splash pad repairs to injectors and pump components <br /> • Daily filter cleaning, chemical balancing and testing ( 1-2hr two fulltime staff daily ) <br /> • Playground repair <br /> • <br /> Groveland Park: <br /> • New building exterior security lights installed <br /> Greenfield Park: <br /> • New locks on all baseball field pedestrian gates <br /> • New field use by permit only signage installed on baseball field fencing <br /> • Benches and other play equipment installation July 2024 <br /> • Playground repair <br /> Hillview Park: <br /> • Installation of new latchable door on hockey rink <br /> • Installation of doggie bag dispenser sign and trash can <br /> • Installation of new 2"x10" boards to enclose the hockey rink for the off-leash area <br /> • Playground repair <br /> • Building exterior door painting <br /> • <br /> 2IPa, - <br />