Laserfiche WebLink
Public Works Staff Report <br /> The following is the List of Parks and projects/ maintenance activities ongoing or planned this year. <br /> Current updates are in black text, and updates from the previous two-month period are in grey. <br /> Ardan Park <br /> • 2nd ditch clean out early winter/fall 2025 <br /> City Hall Campus: <br /> • New grill installation on the West side of the West pavilion, summer 2024 <br /> • No lifeguard on duty sign installed for splash pad <br /> • Stain building Aug. 2024 <br /> • Splash pad: electrical repairs, ordered filter replacements, ordered recirculation pump motor <br /> replacement, ordered contactor replacement <br /> • Splash pad tank check valve inspection <br /> • Daily filter cleaning, chemical balancing and testing ( 1-2hr two fulltime staff daily ) <br /> • Hedge trimming <br /> • Lock repairs splash pad building <br /> • Valve replacement at the splash pad <br /> • Trail gates ordered <br /> Groveland Park: <br /> • New building exterior security lights installed <br /> Greenfield Park: <br /> • New locks on all baseball field pedestrian gates <br /> • New field use by permit only signage installed on baseball field fencing <br /> • Benches and other play equipment installation July 2024 <br /> • Playground repair <br /> • Replaced two locks, one broken one missing <br /> Hillview Park: <br /> • Hockey door adjustments <br /> 21 Page <br />