Laserfiche WebLink
Public Works Staff Report <br /> The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br /> Current updates are in black text, and updates from the previous two-month period are in grey. <br /> Ardan Park <br /> • 2nd ditch clean out early winter/fall 2025. <br /> City Hall Campus: <br /> • New grill installation on the West side of the West pavilion, summer 2024 <br /> • Repair the drinking fountain near the old playground site 2024. <br /> • Ball field checks and field leveling <br /> • Splash Pad controller updates. <br /> • Splash pad inspections and tests. <br /> Groveland Park: <br /> • Tennis net installation <br /> • Arbor Day planting Friday April 22nd at noon <br /> • Ball field checks and leveling <br /> • Girl Scout flower planting 4-28-2024 <br /> • Leaf removal tennis court <br /> Greenfield Park: <br /> • Tennis court leaf removal <br /> • Batting cage net installation <br /> • New clay pitching mound installation. <br /> • Removal of turf mound, currently stored at public works <br /> • Ballfield checks and leveling <br /> • Water turns on, irrigation turn on <br /> • Benches and other play equipment installation June 2024 <br /> • <br /> Hillview Park: <br /> • Litter pick-up often. <br /> • Wood chipping and bush removal around building May 2024 <br /> • Girl Scout flower planting 4-28-2024 <br /> • Ball field checks and field leveling <br /> 21 Page <br />