Laserfiche WebLink
When work is performed by contract, the permittee shall, prior to commencement of <br />work, notify the Regional Hydrologist, in vrriting, the name of the contractor, <br />the address, phone number and project foreman for project. <br />Permittee shall prepare or require the contractor to prepare a comprehensive <br />erosion and sediment control plan addressing construction and final grade stabili- <br />zation to prevent erosion and sedimentation into public Craters. Such plan shall <br />include, but not be limited to, bale diking, temporary ponding, temporary and/or <br />permanent sodding, seeding, mulching and netting_ Such plan shall be completed <br />prior to commencement of authorized work and submitted to the Regional Hydrologist <br />for inclusion in permit file. <br />xvI. Permittee shall ensure that the contractor has received and thoroughly understands <br />all conditions of this permit. <br />xvrr. Permittee and contractor are hereby advised that any violation of the conditions <br />of this permit constitute a misdemeanor, punishable by a fine of $500 and/or 90 <br />days in jail. <br />Xyiii. All exposed soil resulting from the authorized activity shall, within 48 hours of <br />completion of such work, be seeded with a mixture of perennial and annual grasses <br />and then mulched with straw or similar mulch. The use of sod as erosion protection <br />will preclude the need for seeding and mulching, provided the sod is installed with- <br />in the alotted time period and is staked on slopes steeper than 4 feet horizontal <br />distance every 1 foot of vertical rise. <br />