Laserfiche WebLink
June 29, 1983 Page Four <br />Sanitary Sewer Maintenace and <br />Monitoring Program <br />a) Set up Target Area Priorities <br />b) Set up Monitoring Program <br />c) Establish phased maintenance plan <br />d) Prepare summary report <br />TOTAL <br />Estimated No, of <br />Hours to Complete) <br />6 <br />16 to 40* <br />8 to 16 <br />8 to 12 <br />38 to 74 <br />(*Hours will depend on whether work is done by in-house personnel or <br />contractor/consultant). <br />1983 MSA Resurfacing Program <br />a) <br />Prepare <br />preliminary feasibility analysis <br />0 <br />b) <br />Prepare <br />final feasibility report <br />4 <br />to <br />8 <br />c) <br />Prepare <br />plans and speel:ications <br />30 <br />to <br />40 <br />d) <br />Obtain <br />bids and award contract <br />8 <br />to <br />12 <br />e) <br />Administer <br />Construction <br />25 <br />to <br />40 <br />f) <br />Prepare <br />final MSA paperwork <br />8 <br />to <br />12 <br />TOTAL 75 to 112 <br />Storm Water Management Plan <br />a) <br />Delineate drainage areas <br />8 <br />to <br />12 <br />b) <br />Establish runoff factors <br />16 <br />to <br />24 <br />c) <br />Map and calculate drainage areas <br />50 <br />to <br />60 <br />d) <br />Calculate existing peak discharge <br />8 <br />to <br />12 <br />e) <br />Calculate existing system capactiy <br />8 <br />to <br />12 <br />f) <br />Analysize system alternates <br />32 <br />to <br />40 <br />g) <br />Prepare draft report <br />12 <br />to <br />16__ <br />Sub -Total 134 to 176 <br />Work to done by Technician 40 to 50 <br />TOTAL 94 to 126 <br />Comprehensive Street Maintenance Plan <br />a) <br />Inventory of existing streets <br />90 <br />to 110 <br />b) <br />Identify repair needs <br />20 <br />to 30 <br />c) <br />Develop annual maintenace plan <br />16 <br />to 24 <br />d) <br />Evaluate funding options <br />8 <br />to 16 <br />TOTAL <br />134 to 180 <br />