Laserfiche WebLink
MEMO TO: Mayor and City Council <br />FROM: Director of Public Works/Community Development <br />DATE: June 2, 1983 <br />SUBJECT: STATUS REPORT ON M.S.A. RESURFACING PROGRAM <br />The streets proposed to be resurfaced have received a detailed inspec- <br />tion including a coring and subgrade sampling, crack inventory, failed <br />pavement inventory and drainage survey. Summary of field investigations <br />is as follows: <br />1) Groveland Road <br />a) 4,385 lineal feet, 44 feet wide <br />b) traverse cracking every 15 to 25 feet <br />c) 350 feet by 22 feet will require removal and replacement <br />due to subgrade failure <br />d) 3 core samples taken <br />e) Pavement thickness is 1 to 2 inches with loamy sand to <br />sandy subgrade with one section having 6 inches of high <br />organic soils <br />2) Arden Avenue <br />a) 2,535 lineal feet, 44 feet wide <br />b) traverse cracking every 25 to 35 feet <br />c) 425 feet by 22 feet will require removal and replacement <br />due to subgrade failure <br />d) 4 core samples taken <br />e) Pavement thickness is 3/4 to 2 inches with loamy sand to <br />sandy subgrade with one section having up to 18 inches of <br />organic soils. <br />f) one block had 6 to 8 inches of glass 5 sub -base. <br />g) Ardan and Groveland intersection needs reconstruction. <br />3) Hillview <br />a) 5,155 lineal feet, 44 feet wide <br />b) traverse cracking every 30 to 40 feet <br />c) Greenwood intersection needs drainage/crown improvement <br />d) 4 core samples taken <br />e) Pavement thickness is 1� to 24 inches with sandy loam soils <br />4) Edgewood <br />a) 4,775 lineal feet, 44 feet wide <br />b) traverse cracking every 20 to 35 feet north of Highway 10, <br />40 to 50 feet north of Edgewood Community Center, 10 to 15 <br />feet south of Edgewood Community Center <br />c) County Road tl needs reconstruction <br />e) 4 core samples taken <br />