My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1983/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1983
>
Agenda Packets - 1983/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 3:37:01 PM
Creation date
3/12/2025 3:34:55 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
® MEMO TO: Mounds View City <br />FROM: Bruce K. Anderso <br />Parks, Recreatiq <br />DATE: April 7, 1983 <br />RE: Fencing Bids <br />After an indepth review of each of the four bid proposals that <br />staff received for the fencing of the outfield fences at Silver <br />View Park, staff would recommend that the City Council award the <br />bid to Cyclone Fence in the amount of $4,283.20. Although Cyclone <br />Fence is not the low bid by approximately $146.00, staff has re- <br />viewed the specifications from each* of the respective fencing <br />contractors and the fence that is bid by Cyclone is of a much <br />higher quality than the fence specified by the current low bidder. <br />The differences between the two bid specifications are in the top <br />rail of the fence wherein the low bidder bid an SS20 top rail which <br />is a 2" o.d. tubing pipe and Cyclone Fence bid a C section heavy <br />duty aluminized pipe. The difference in bending strength between <br />the two fence posts is 245 pounds of bending strength for the C <br />section compared to 87 pounds for the 2" o.d. tubing. In addition <br />to the top rail difference, the low bidder bid a 2" line post <br />compared to a A" line post from Cyclone. The end and corner posts <br />on Cyclone's bid were 3�" compared to 2h" terminal posts on the <br />0 low bid. <br />Based on the differences in the two bid specifications, staff <br />would recommend that Cyclone Pence be awarded the low bid of <br />$4,283.20 based on the following specifications as submitted by <br />Cyclone Fence: <br />1. 960 feet of 9 gauge, .40 oz., aluminum coated, 2" square fabric. <br />2. Galvanized C section posts, 1.875" in diameter spaced at 10 foot <br />intervals to be driven into the ground. End and corner posts <br />will be roll formed 3�" posts set in concrete with tension <br />wires placed along the bottom of the fence. <br />Staff has included a copy of the Cyclone Fence bid proposal and <br />would entertain any quetsions you might have prior to the Council <br />meeting. <br />BKA/sll <br />Attachment <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.