My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1983/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1983
>
Agenda Packets - 1983/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 3:37:01 PM
Creation date
3/12/2025 3:34:55 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
apnrs 66]1 <br />a -IE V. 6ISI <br />Cyclone Fence <br />United Slelee Steel Cerperelleff DATE March 25th <br />AME <br />PROPOSAL TO _ -- - — SHIP TO: <br />� <br />City Of hloundsview Sallie <br />STREET <br />STiiEET <br />2401 N E Hwy 10 <br />.._.__.__...._—_STATE . ___ZIPCOD <br />STATE � � ZIP CODE CITY <br />Noundsview, Minnesota <br />SPECIFICATIONS <br />OVERALL HEIGHT 51 ABOVEGRADE BARD WINE ()____STRANDS FAORICHEIGHT 6011 <br />—P.V.C. COATED ❑ <br />CHAIN LINK FABRIC —ALUM. COATED E7 WEIGHTOF COATED MESH —GALVANIZED ❑ COATING .40 of WIRE GAUGE 9 SIZE 2„ <br />LINEPOSTS—SHAPE C Section <br />RAIL— roll formed <br />—' '---------P.V.C. COATED ❑__..___ <br />DIMENSION 1.675X1.625 GALVANIZED ® SPACING 101 <br />MIDDLERAIL ❑ TOPTENSIONWIRE ❑ <br />BOTTOM RAIL ❑ none SOT. TENSION WIRE ❑ none GAT <br />END&CORNER POSTS— roll formed 3�03 <br />• <br />QUANTITY ITEM <br />GATEPOSTS — none <br />9601 complete fence per above specifications <br />8 roll formed end posts <br />NOTE:ALL STAKING, GRADING AND CLEARING BY OTHERS. <br />ALL WORK TO BE COMPLETED BY 5-5-83 <br />PRICE PER FOOT INSTALLED FENCE $4.17 <br />ALIKERMINALS INSTALLED IN CONCRETE $35.00 EACH <br />RIC STRFN(:TW <br />THEORETICAL MINIMUM BENDING FORCE ON CRITICAL AXIS <br />LINE POST 247 lbs @60"ABOVE GRADE <br />TOPRAIL 237 lbs 010'0"SPAN <br />TERMINAL 486 lbs @GO"ABOVE GRADE <br />SET IN CONCRETE ❑ <br />MATERIALONLY ❑ <br />MATERIAL &INSTALLATION 91 <br />PRICE <br />TOTAL $4283.20 <br />Price subject to change after 5-15-84nd is based on all work performed <br />In 1 phase operatlonlsl. Charge for each Immobilization <br />Add to total 11for installation at ter <br />layout, grades and comer stakes by others, Price Is based on all lines <br />P.O.B. POINT <br />erected FREIGHT PREPAID El accessible by mobile equipment unless otherwise specified in this proposal. <br />COLLECT ❑ Hoist through rock will be charged extra. <br />TERMS OF PAYMENT: Net Cash 30 Days or as otherwise stated heroin. <br />ACCEPTANCE: After receipt of signed copy from Buyer, this proposal when accepted SUBMITTED BY: <br />by Cyclone Fence, at Its General ncrs In Joliet, <br />tore Illinois, or at any <br />district sales olllce, becomes a contract between the two parties, <br />The conditions on the reverse side of this sheet are made a pan hereof. Kick KUehlwein <br />-IUYEWS SIGNATURE Contracting Representative <br />PHONE: 641-8742 <br />MAILING ADDRESS: 2545 University Ave <br />MATE St. Paula Minnesota <br />ORIGINAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.