My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1983/07/18
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1983
>
Agenda Packets - 1983/07/18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:50:02 AM
Creation date
3/17/2025 10:50:01 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/18/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T �tNNE50rq y <br />O <br />D Q <br />�'�tiT 01 iViPtty�O <br />� III, r oil I u111111P"bnlrl <br />hpril 4, 1983 <br />III 11 Il'til Ili I <br />I)l'�)illlllh•III V1� ���f.11lti�11111i111(III <br />�� I'Illlti�)()I'lill11111 I it II�(�Il It <br />til. I'illl�. �II11111'�IIhI .i:ll�i.l <br />CITY Ci <br />11,0110rabie Ouane 14. McCarty <br />Mayor of Mounds View <br />f401 Highway 10 <br />Mounds view, Minnesota 55112 <br />°e: New TH 10 <br />Dear Mayor McCarty: <br />Thank you for your letter of March 15, 1983 regardingnruc <br />ion of New is certainlyunk <br />Highway 10. Your interest and support in this proposed project <br />appreciated. <br />As you are aware, this project involves the construction of a four lane divided <br />highway between Co. Rd. J in Mounds View and TH 10/47 in Coon Rapids on a new <br />location approximately one mile north of existing TH 10. A Draft Environmental <br />hedcinSJunelloftthat sameuyear. iSinceearly <br />that7timef, the Location <br />was circlated the projecthaspublic <br />been1linrang <br />"hold" status due to our inability to identify a source of funding. At the <br />present time, this project still remains etive due to iits <br />iprojectedse high <br />ition <br />cost ($21 million) in a funding category for not whicfor he <br />willtchangennitile foreseeable ufuture nt of aisiimpossible tolable . say haththis er rthis <br />time, <br />d in your <br />However, as an interim ly pglconstructionoof attwoelane roadwaytwhiclr <br />will <br />has now officially programmed <br />will connect Co. Rd. J and TH 65. This new roadway will be constructed on the <br />same location as the future ' New TH 10." This project is currently scheduled <br />for a November 1985 contractletting. Although this two lane connection is not <br />the ultimate solution, it will definitely relieve some of the traffic pressure <br />on Co. Rd. J and existing TH 10. A geometric layout for this project is <br />currently being prepared and our District 5 office will be contacting the city <br />in the near future to discuss the proposal. <br />I want to thank you for your interest and if I can be of further assistance, <br />please let me know. <br />Sincerely, <br />Richard P. Braun <br />Commissioner <br />All 1•:yual Op1wrionify li"Iplayrr <br />
The URL can be used to link to this page
Your browser does not support the video tag.