Laserfiche WebLink
MEMO TO: Mounds View City Council <br />FROM: Bruce K, Anderson, Director <br />Parks, Recreation and Forestry Dept. <br />DATE: August 18, 1983 <br />RE: Review of bid proposals for. 1984 one -ton dump truck <br />Staff repared bid specifications and forwarded them to approxi- <br />mately 60 local truck and automobile firms in the metropolitan <br />area fo- the purchase of a one -ton dump truck. Bid proposals <br />were received from ten firms for the purchase of a one -ton dump <br />and chassis as well as two bid options for a winch and boom and <br />electric 8-foot ball. The bids ranged from a low of $11,087.45 <br />to a high of $13,067.00. <br />Staff would recommend the purchase of the 1984 GMC truck model <br />number TC31403, bid as specified at the low bid cost of <br />$11,087.45. In addition staff would recommend that we add the <br />additional $234.00 for the La Hass Box, which is a much higher <br />quality box than the L&Z Box from a number of perspectives, but <br />one major difference is going from a twelve -gauge to a ten -gauge <br />steel. Total cost of the truck chassis and dump box would then <br />be $11,321.45, still $165.00 below the second low bid price from <br />L&Z Company, In addition, staff would recommend that the Venturo <br />2000 Crane offered by L&Z at $695.00 and their heavy duty snow <br />plow at $1,285.00 be purchased as the two low bid options. Staff <br />recommends these two purchases as they are also the two low bids <br />and would add an additional $1,980.00 to the bid price which <br />would then be a total of $13,301.45. <br />Staff has budgeted $15,000.00 for the purchase of the vehicle and <br />would furhter recommend that the additional $1,700.00 be utilized <br />to purchase a two-way radio for the vehicle at $650.00 and stobe <br />and safety lighting as an additional $200.00 option or a total of <br />$853.00. <br />Staff feels that the remaining $700.00 would allow us to convert <br />the vehicle to propane and any other minor changes that may be <br />required to the vehicle such as; painting if we are not able to <br />get the orange paint in stock. Even with all of these aforemen- <br />tioned modifications, staff still feels that the project will come <br />under the $15,000.00 budgeted. <br />In addition, staff has attached a copy of a listing of all our <br />existing vehicles in fleet including the department they are <br />assigned to, the vehicle number, the year, the general <br />description, their percentage uses, as well as needs and voids <br />with the equipment. Staff will be on hand at Monday evening's <br />council meeting to discuss any questions you may have regarding <br />the equipment or the bid proposals that were received by the City <br />on Wednesday afternoon, <br />