My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1984/02/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1984
>
Agenda Packets - 1984/02/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:07:11 PM
Creation date
3/17/2025 2:07:10 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/13/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-2- <br />1. The Contractor shall afford the City of Mounds View personnel the <br />opportunity to inspect parts determined to need repair or replace- <br />ment prior to coimiencement of repair or disposal of parts. <br />B. Well and pump equipment shall be completely disinfected per <br />Minnesota Department of Health procedures prior to placing well and <br />pump back in service. Water sample test shah oe proviaeo oy <br />Contractor certifying well has been adequately disinfected. <br />9. Well shall be continusously test pumped to waste at a rate of 1400 <br />gallons per minute for at least 10 hours or until water is flowing <br />clear whichever is greater. Contractor shall furnish all piping, <br />valves, pressure gauges, orifice and other necessary equipment. <br />Discharge point is shown on attached sketch. Any damage caused by <br />test pumping shall be repaired by Contractor. <br />10. Bid Price shall include labor to install or affect all repairs <br />determined necessary after inspection of pump. Separate <br />bid prices are requested for various repair and replacement items. <br />Estimated quantities for repair and bid comparisons have been <br />made. Final repair quantities shall be approved in writing by <br />the Clerk -Administrator of Mounds View. Final Contract price <br />jllYll bA UUJ Yi UU4 p- unit bid pr1— and final proved repair <br />work. <br />11. The base bid provides for a nominal amount of bailing of the well. <br />After initial removal of pump the Contractor shall submit to the <br />City for approval an estimated maximum volume of material necessary <br />to be bailed from the well to reestablish original well depth. <br />Final payment shall be based on actual cubic yard volume of material <br />bailed from well. <br />12. Contract Award shall be based on lowest responsible bid received <br />for Base Bid items. The City may elect to award additional work <br />listed in the alternate bid schedule. The City reserves the right <br />to wavier minor irregularities and/or reject all bids. <br />n <br />
The URL can be used to link to this page
Your browser does not support the video tag.