My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1984/02/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1984
>
Agenda Packets - 1984/02/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:19:07 PM
Creation date
3/17/2025 2:19:07 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/27/1984
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SOW Pau, <br />Mf:TROPOIITAN AIRPORTS COMMISSION <br />! . <br />P. a ooz I,1oo TWIN CITY f.ImPOnT rtNUIE60TA 55I11 <br />' UI°RICE OF E%IiCUTIVE nNECiOn PHONE (612)726.1692 <br />I'uln.l•nry ", 1.904 <br />1kIwi,.!IIit Ivt! InNlit-I J. El, ,ulll <br />�11I II:U nlll]dt;, <br />!V:Lr I+cvraconlattva Knul.-:: <br />'111a ,Nbtr4vlitan Airports Connission, in its 1984 Capital Improvement <br />pr.cA7rmn, intends to initiate construction at the Anoka County -Blaine <br />Ait7ort of those item, identified in Phase IA in the Airport Master <br />Plan. This phase of development consists of the preparation of an <br />area on the east side of the airport for construction of additional <br />storxga hangars. The storage hangar area would be connected with <br />Runways 17/35 and 8/26 by partial parallel taxiways. <br />The Commission is also planning, during 1984, to move ahead with an <br />cnvironmental assessment of the proposed Phase IB development as out- <br />lined in the Airport Master Plan. This developrent incorporates Trove <br />of Runway 17/35 to,the north of approximately 1,000 feet, as well as <br />an extension of RLUAuav 8/26 to the east by 800 feet, to a total length <br />of 41000 feet. It is anticipated that a consultant will be selected <br />to carry out this environmental assessment, and that a majority of the <br />work will be accomplished during 1984 and early 1985. We would like to <br />have this inprovement project underway during 1985 in order to move <br />P.unway 17/35 to the north as early as possible. It is doubtful whether <br />the additional building area identified in Phase IB will be needed as <br />part of this project. <br />The Capital Improvement Program incorporating these items will be con- <br />sidered by the Detrcpolitan Airports Oamdssion at its meeting on <br />February 21, 1984. Should you have any questions regarding these items, <br />feel free to contact ne. <br />sincerely yours, <br />Nigel D. F� y^---:g <br />Director of Planning & Engineering <br />/jr <br />OFFICE LOCATION-60+n :elh AVE. SO. —WEST TERMINAL AREA—M[hNEAPOLIS•SAINT PAUL INTERNATIONAL AIRPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.