My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1984/02/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1984
>
Agenda Packets - 1984/02/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:19:07 PM
Creation date
3/17/2025 2:19:07 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/27/1984
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
181 <br />1 8.2 PRASE 1 <br />3 <br />8.2.1 Phase 1A <br />Phase 1A development includes the following improvements: East Building <br />Area site preparation (20 acres); Runway 17L-35R taxiway construction <br />(40 feet by 2,000 feet); and cross -over taxiway construction (three <br />taxiways, 40 feet by 500 feet). <br />Exhibit 8-1 identifies the specific projects and preliminary cost esti- <br />mates for each. Phase 1A development is illustrated in Exhibit 8-2. <br />8.2.2 Phase 113 <br />Phase 18 development includes the following improvements: West Building <br />Area site preparation (30 acres, including perimeter taxiway); Runway <br />8R-26L construction (100 feet by 800 feet -- widen existing runway to <br />100 feet and relocate Xylite Street); Runway SR-26L taxiway construction <br />+ (40 feet by 800 feet); cross -over taxiway construction; Runway 17L-35R <br />construction (75 feet by 950 feet); 17L-35R taxiway construction (40 feet <br />by 950 feet); Runway 35 threshold relocation and taxiway removal. <br />Exhibit 8-3 identifies the specific projects and preliminary cost esti- <br />mates for each. Phase 1B development is illustrated in Exhibit 8-4, <br />J 8,3 PHASE 2 <br />Phase 2 development includes the following improvements: Northwest <br />j Building Area site preparation (30 acres, including perimeter taxiway and <br />1 access road), Runway 8L-26R construction (75 feet by 3,200 feel); Runway <br />eL-26R taxiway construction, including cross -over taxiways; and Runway <br />17L-35R taxiway construction. <br />Exhibit 8-5 identifies the specific projects and preliminary cost esti- <br />mates for each. Phase 2 development is illustrated in Exhibit 8-6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.