Laserfiche WebLink
ELECTRICAL CONTRACTING . INDUSTRIAL . COMMERCIAL . RESIDENTI <br />6525 CENTRAL AVENUE N.E., FRIDLEY, MINN. 55432 . 571-8211 <br />April 27, 1984 <br />City of Iloundsview <br />2401 highway 10 N.E. <br />hloundsview, NN 55112 <br />Attn: Steve Thatcher <br />Re: Well is 3, 5, 6 and F2 Booster Pump <br />Remove aluminum wire from control panel to pump motor and <br />replace with copper wire. Flake motor connection, secured, <br />ground, and bond the service equipment, and install Hyplug <br />on aluminum service conductors. <br />The total cost per item is as follows: <br />Well '3 $880.00 (EIGHT HUNDRED EIGHTY AND <br />1,10/100 DOLLARS). <br />Well b5 $935.00 (IIIIJE HUNDRED THIRTY FIVE <br />AND 110/100 DOLLARS). <br />��r% /S <br />Well 96 $935.00 (NINE HUNDRED THIRTY FIVE <br />AND NO/100 DOLLARS). <br />Booster Pump #2 $995.00 (NINE HUNDRED NINTY FIVE <br />AND I10/100 DOLLARS). <br />If you have any questions regarding above, please feel <br />free to call me at 571-3211. <br />Sincerel <br />Dacon' lectric Coa <br />y <br />�i lL'J Z� <br />Herbert W. Bacon, Jr. <br />HWB:mb <br />