Laserfiche WebLink
M,S,A, STREET PROJECT 1985 <br />CITY OF MOUNDS VIEW, MINNESOTA <br />CITY PROJECT 65.1 <br />APRIL 15, 1985 <br />ABSTRACT FOR THREE LOW BIDDERS <br />UNIT <br />UNIT <br />UNIT <br />ITEM <br />ITE <br />UNIT <br />QUANTITY <br />PRICE <br />TOTAL <br />_ PRICE __ <br />TOTAL <br />PRICE _ <br />TOTAL <br />_ <br />DESCRIPTION <br />_ <br />LUMP <br />SUM 1 <br />10,000.00 <br />10,000.00 <br />21,755.00 <br />21,735.00 <br />8,500.00 <br />8,500. <br />I. <br />2021.501 <br />MOBILIZATION <br />2, <br />2104.501 <br />REMOVE EXISTING <br />151, RCP STORM <br />570 <br />7.50 <br />4,275.00 <br />7.00 <br />3,990.00 <br />7.39 <br />4,212. <br />SEWER <br />L.F. <br />5. <br />2104.501 <br />REMOVE EXISTING <br />181, RCP STORM <br />L.F. <br />50 <br />7.50 <br />375.00 <br />7.00 <br />350.00 <br />7.39 <br />369. <br />SEWER <br />4. <br />2104.501 <br />REMOVE EXISTING <br />2411 RCP STORM <br />L.F. <br />100 <br />8, 00 <br />800.00 <br />7.50 <br />750.00 <br />7.90 <br />790. <br />SEWER <br />5. <br />2104.509 <br />REMOVE EXISTING <br />1 <br />100.00 <br />IOD.00 <br />50.00 <br />50.00 <br />52.75 <br />52. <br />4211 APRON <br />EACH <br />6, <br />2105.501 <br />COMMON EXCAVATION <br />C.Y. <br />5,500 <br />1.90 <br />10,450.00 <br />3.45 <br />18,975.00 <br />3.64 <br />20,020. <br />7. <br />2105.535 <br />SALVAGED TOP SOIL <br />4,50 <br />1,125,00 <br />2.00 <br />500.00 <br />2.00 <br />500. <br />FROM STOCKPILE <br />C,Y. <br />250 <br />8, <br />2111,501 <br />TEST ROLLING <br />R.S. <br />26.5 <br />10.00 <br />265.00 <br />15.00 <br />397.50 <br />20.00 <br />530. <br />9. <br />2112.501 <br />SUBCRADE <br />R.S. <br />26.5 <br />80.00 <br />2,120.00 <br />80.00 <br />2,120.00 <br />75.00 <br />1,987. <br />PREPARATION <br />10. <br />2211.501 <br />AGGREGATE BASE <br />700 <br />5.50 <br />3,850.00 <br />5.95 <br />4,1.7,Gu <br />8.45 <br />5,915. <br />CLASS 5 <br />TON <br />11. <br />2331,504 <br />BITUIINOUS MATERIAL <br />175 <br />205.00 <br />35,875.00 <br />200.00 <br />A D00.00 <br />205.00 <br />35,875. <br />FOR 141XTURE <br />TON <br />12. <br />2331.514 <br />BASE COURSE MIX, <br />TON <br />3,850 <br />10.35 <br />39,847.50 <br />10.52 <br />40,502.00 <br />10.90 <br />41,965. <br />13. <br />2341.504 <br />BITUMINOUS MATERIAL <br />205.00 <br />32,390.00 <br />200.00 <br />31,600.00 <br />205.00 <br />32,390 <br />FOR MIXTURE <br />TON <br />158 <br />2341,508 <br />WEARING COURSE MIX, TON <br />2,600 <br />11,75 <br />50,550.00 <br />12.10 <br />53,020,00 <br />12.90 <br />33,540 <br />14. <br />15. <br />2357.502 <br />B!TUIINOUS MATERIAL <br />I.10 <br />2,321,OOI <br />1.05 <br />2,215,50 <br />.95 <br />2,004 <br />FOR TACK 004T <br />GAL, <br />2,110 <br />174,343.50 195,370.00 _ _- 188,651� <br />PAGE SUBTOTAL <br />