COST ESTIMATE
<br />M.S.A, STREET PROJECT 1985
<br />CITY OF MOUNDS VIER, MINNESOTA
<br />CITY PROJECT 85-1
<br />APRIL 15, 1985 H A S ASPHALT CO.
<br />_ ..................................................
<br />._ .- ------- SAP 146-229-04 NGNd'ARTIC I PATING TOTAL
<br />UNIT ....__--------.
<br />NO. __ - DESCRIPTION _--_ --LY UNIT Y _- PRICE _ OUANTITYI -_ TOTAL QUANTITYI TOTAL QUANTITY TOTAL
<br />I, 2021.501 MOBILIZATION LUMP SUM 10,000.00 0.6 t6,000.00 0.45 4,000.00 1 10,000.00
<br />2, 2104.501 REMOVE EXISTING
<br />15" RCP STORM
<br />SEVER L.F. f _ 7.50 570 S 4.275.00 0 f 0_00 570 S 4,275.03
<br />3. 2104.501 REMOVE EXISTING
<br />1811 RCP STORM
<br />SEWER L.F. $__ 7,50 50 $ 375.00 0 f 0_00 50 S 375.00
<br />4. 2104.501 REMOVE EXISTING
<br />24" RCP STORM
<br />SEWER L.F. S,^ 8.00 100 $ 800.00 0 S 0_00 100 S 800.00
<br />5, 2104.509 REMOVE EXISTING
<br />42" APRON EACH f_ 100.00 1 f 100.00 0 f 0.00 1 S 100.00
<br />6. 2105.501 COMMON EXCAVATION C.Y. f __ 1_90 5,200 £ 9,880.00 300 f 570.00 5,500 10,450.00
<br />7, 2105.535 SALVAGED TOP SOIL
<br />FROM STOCKPILE C.Y. f _4_50 250 S 1,125.00 0 S 0_00 250 S
<br />8, 2111.501 TEST ROLLING R.S. S 10,00 26.5f 265.00 0 S 0_00 26.5 $ 265.00
<br />9, 2112.501 SUBGRADE
<br />PREPARATION R.S. S. 80.00 26.5f 2,120.00 0 f 0_00 26.5 S 2,120.00
<br />10. 2211.501 AGGREGATE BASE
<br />CLASS 5 TON f__ 5.50 400 S 2,200.00 300 $ 1,650.00 700 S 3,850.00
<br />11, 2351.504 BITUMINOUS MATERIAL
<br />FOR MIXTURE TON f_ 205,00 175 E 35,875.00 0 $ 0_00 175 35,875.00
<br />12. 2i31.514 BASE COURSE MIX, TON S - 10y35 3,850 S 39,847.50 0 f 0_00 3,650 39,847.50
<br />13. 2341.504 BITUMINOUS MATERIAL
<br />FOR MIXTURE TON f 205.00 80 S 16,400.00 78 $15.990.00 158 32,390.00
<br />14. 2341.508 WEARING COURSE MIX, TON $ 11.75 1,300 S 15,275.00 1,300 $15,215.00 2,600 30,550.00
<br />15. 2357.502 BITUMINOUS MATERIAL
<br />FOR TACK COAT GAL. $ 1.10 1,500 S 1,650.00 610 S 671.00 2,110 S 2,321.00
<br />16. 2503.541 12" RC PIPE SEWER
<br />CLASS V L.F. f 22.00 160 f 3,520.00 0 S 0_00 160 S 3,520,00
<br />Y
<br />17. 2503.541 18" RC PIPE SEWER
<br />CLASS V L.F. S _- �5.00 60 S 1,500.00 0 f 0.00 60 S 1,50
<br />PACE SUBTOTAL f111t201.50 S 381156.00 179,363.51
<br />
|