Laserfiche WebLink
COST ESTIMATE FOR M.S.A. PROJECT 1985 <br />CITY PROJECT 85-1 <br />PAGE TWO OF THREE ______ ___________.._____...__..._. <br />rN SAP 146-229-04 N011-PARTICIPAT ING TOTAL <br />UNIT <br />TEMII <br />LD.L DESCRIPTION __UNIT . PRICE QUANTITY TOTAL OUAIITI TY� TOTAL OUANTITYI TOTAL <br />18. 2505.541 21" RC PIPE SEWER <br />f 30 00 280 S 8,400.00 0 S 0_00 280 f 8,/00_00 <br />CLASS V <br />L.F. <br />_-- <br />19. <br />2503.541 <br />3011 RC PIPE SEWER <br />CLASS V <br />L.F. <br />S,__ <br />55,00 <br />180 <br />S , 9,900,00 <br />0 <br />S <br />0_00 <br />I80 <br />f 9.900.00 <br />20. <br />2505.541 <br />42" RC PIPE SEWER <br />CLASS V <br />L.F. <br />S _ <br />90.00 <br />12 <br />S 1,080,00 <br />0 <br />S <br />0y00 <br />12 <br />f I,080.00_ <br />21. <br />2506.509 <br />CONSTRUCT CATCH <br />BASINS, DESIGN K <br />EACH <br />S <br />660.00 <br />3 <br />f 1,980,00_ <br />O <br />f <br />0_00 <br />3 <br />f 1,980.00 <br />22. <br />2506.509 <br />CONSTRUCT CATCH <br />BASINS, DESIGN Y <br />EACH <br />f <br />750.00 <br />2 <br />S I,500.00 <br />O <br />f <br />0_00 <br />2 <br />f 1.500.00 <br />23. <br />2506.509 <br />CONSTRUCT CATCH <br />BASINS, DESIGN 2 <br />EACH <br />S 2,300.00 <br />2 <br />f 4,600,00 <br />O <br />S <br />0_00 <br />2 <br />f 4.600.0 <br />24. <br />0506.602 <br />RELOCATE CATCH <br />EACH <br />f <br />750.00 <br />2 <br />S _ 1,500.00 <br />0 <br />f <br />0_00 <br />2 <br />f 1,500.00 <br />BASIN <br />/ 5. <br />2506.516 <br />CASTING ASSEMBLIES <br />EACH <br />S <br />180.00 <br />10 <br />S 1,800.00 <br />0 <br />f <br />0y00 <br />10 <br />f 1,800.00 <br />26. <br />2506.522 <br />ADJUST FRAME AND <br />RING CASTING <br />EACH <br />J <br />85_00 <br />8 <br />S ti80.00 <br />15 <br />3 1,275.00 <br />23 <br />S 1.955.00 <br />27. <br />0504.602 <br />ADJUST WATER <br />VALVE BOX <br />EACH <br />f <br />60_y00 <br />4 <br />S 240.00 <br />8 <br />f <br />480,00 <br />12 <br />f 720.00 <br />28. <br />2521.501 <br />4" CONCRETE WALK <br />S.F. <br />S� <br />1__25 <br />13,300 <br />f 16,625.00_ <br />1,500 <br />f 1,815.00 <br />14,800 <br />f I8,500.00 <br />29. <br />2521.501 <br />6" CONCRETE WALK <br />S.F. <br />f <br />�.65 <br />4,400 <br />S !,MgO <br />30 <br />f <br />49.50 <br />4,430 <br />f -b509,50 <br />30, <br />2531,501 <br />CONCRETE CURB AND <br />L.F. <br />f <br />4.50 <br />5,900 <br />f 26 550.00 <br />-�-- <br />300 <br />S 1,350.00 <br />6,200 <br />S 27,900.00 <br />GUTTER DESIGN <br />31. <br />2531.501 <br />CONCRETE CROSS CURB <br />AND GUTTER <br />L.F, <br />S <br />_ 7_80 <br />160 <br />S 1,248.00 <br />0 <br />f <br />Oy00 <br />160 <br />f �248. <br />32. <br />33. <br />2535.81TUMINOUS CURB <br />2575.505 SOD <br />L.F. <br />SO,YD, <br />f. <br />f-__ <br />3.00 <br />!.10 <br />2DO <br />5,900 <br />3 600,00 <br />f 6,490.00 <br />0 <br />0 <br />f <br />S <br />0_00 <br />0_-00 <br />200 <br />5,900 <br />f 600.00 <br />f 6.490.00 <br />54, <br />2105.525 <br />BLACK DIRT FROM <br />OFF SITE <br />CU.YD. <br />,f 6_00 <br />490 <br />S 2j940.00 <br />0 <br />f <br />0,_00 <br />490 <br />S 2,940�, <br />15. <br />2501.511 <br />24° C.M. PIPE. <br />L.F, <br />S <br />- 40.00 <br />30 <br />f 1,200,00. <br />O <br />f <br />0,_0000 <br />30 <br />f 11200.00 <br />S 94,90 $ 5,029.50 f 99.622.50 <br />PAGE SUBTOTAL 93,0 <br />