My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1985/05/20
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1985
>
Agenda Packets - 1985/05/20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 8:57:06 AM
Creation date
3/24/2025 8:57:06 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
5/20/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMO TO: CLERK -ADMINISTRATOR AND CITY COUNCIL <br />FROM: DIRECTOR. OF PUBLIC WORKS/COMMUNITY DEVELOPMENT JI� <br />DATE: MAY 16, 1985 <br />SUBJECT: REPAIR OF BROKEN/SEPARATED SANITARY SEWERS <br />FOUND DURING THE 1985 TELEVISING <br />The 1985 Sanitary Sewer Televising Program located ten <br />areas where the sanitary sewer should be excavated. The <br />work in these ten locations will involve replacing sections <br />of pipe varying in length from one foot to five feet. If <br />this work is not done, the sand around the pipe will fill in <br />and cause us more problems in the future. <br />The majority of the repairs are under streets that are <br />proposed to be patched, seal -coated or overlayed with <br />bituminous per the 1985 Street Maintenance Program. We have <br />awarded the work on the Street Maintenance Program to H 6 S <br />Asphalt Company. Therefore, completing the repair of the <br />sanitary sewer as soon as possible is imperative. <br />Normally, this work is done on a time and materials basis. <br />There is a contractor in the City installing storm sewers <br />for the 1985 MSA Project. Attached is a copy of his unit <br />prices for conducting this work. <br />I will provide another quote for you to review on Monday <br />night. I will also bring along the pictures of the problem <br />areas for you to review and verify that these areas need to <br />be repaired. <br />I will recommend which contractor to hire on Monday night. <br />I expect the cost of this repair to be between $5,000 and <br />$9,000. There is $15,000 budgeted for this repair work in <br />1985 on line item 730-121-4190. <br />SWT/mjs <br />
The URL can be used to link to this page
Your browser does not support the video tag.