My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1985/12/16
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1985
>
Agenda Packets - 1985/12/16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 3:40:16 PM
Creation date
3/26/2025 3:40:16 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/16/1985
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-3- <br />The facility is being designed to allow for the capacity of hav- <br />ing artificial ice should Lake Region Hockey or the City deter- <br />mine this is an area that we need to expand into. in addition, <br />staff feels that this facility will serve as a central community <br />focus for all activities and will he utilized by not only City <br />groups, but rented out to the school district, also all large <br />qroup activities, service organizations and neighboring munici- <br />palities. <br />Staff has also met with a gentleman by the name of Del Erickson <br />who is currently preparing a feasibility study for the City of <br />Edina which is proposing to construct five enclosed natural ice <br />arenas, and staff feels that should the City desire to explore <br />the concept of a multi -purpose community center, that a consult- <br />ant be retained for an amount not to exceed $3,000 to finalize <br />and firm up the concept plans of constructing a community center <br />building. Additional items that staff would like to see included <br />would be a running track which could be elevated above the arena <br />for winter use as well as indoor storage facilities for park <br />maintenance equipment which would increase iur maintenance <br />efficiency. <br />GENERAL PARK IMPROVEMENTS <br />Staff has prepared the following list of park improvements which <br />have not been listed on a prioritization basis but I am prepared <br />to provide my professional opinion regardinq each of their <br />"impact" as well as further explain each of the delineated items. <br />k. Laulidings and park shelters - We currently have four park <br />shelter tuildings within the City's park system at Groveland, <br />Woodcrest, Lambert and HMO w Parks. Staff would propose <br />the construction of two additional park shelter uuildings. <br />The first at Silver View Park, which would serve as a head- <br />quarters for the adult athletic program, outdoor restrooms, <br />as well as a small mairtenance facility to be located between <br />the backstops at an estimated cost of $60,000. The second <br />proposed shelter building would be a large open air picric <br />shelter located at Greenfield Park as per the park system <br />plan at a cost or $30,000. Total buildings and/or park shel- <br />ters g90,000. <br />B. Trees and general landscaping - The original protection for <br />trees and qeneral landscaping throughout the City's park sys- <br />tem was based at $528,900 which were 1980 figures. Staff <br />would recommend that this amount be reduced by $478,900 or a <br />total of $50,000. The reason staff recommends such a major <br />reduction in this area is that our forestry department is <br />currently planting bare root stock at the rate of approxi- <br />mately 200 large trees per year for $5,000 - 58,000. With <br />$50,000 we would be able to do major landscapinq improvements <br />with the majority of the costs being contracted out to pri- <br />vate nurserymen. This cost would be broken down and allocat- <br />ed for each of the park areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.