Laserfiche WebLink
r <br />IhIT A <br />1 Est all lisI1 60 ddy ramp lelion 'Ate dule. <br />2. Incnrporat,. $Ilkl/dav liquidated dam.'I •. rLnc.. <br />J. Allow a Maximum of 2 consecutive nights of W,11 No 1 &-will lmr <br />t Add (3) duplex receptacles and individual 20A circuits in Well No I <br />Pumphouse <br />5. Delete capacitors for Wells No. 1 and 3. <br />6 WriLe deduct aiternalc lot 'Lntk N,- 2 rota lul :' tep Lu'rmeW <br />1. Provide automatically switched receptacles to be energized only wile❑ <br />the associated well pump is running for the following equipmenL. <br />Well No. l (2) Fluoride Pumps <br />Chlorine Pump <br />Aerator Valvo <br />Well No. 2 Same as Well No. L <br />Well No. 3 Same as Well No. 1 plus Potassium Permanganate Pump <br />B. Provide power circuit for additional air compressor at Well No. 1 <br />Pumphouse. <br />9. Add telemetry to indicate "Well No 2 Running" at Well No. I Treatment <br />Plant. <br />10. Get advertisement for bids to Construction Bulletin by February 21 an^ <br />New Brighton Bull^tin by February 19. <br />11 Provide construction documents to bidders. <br />12. Answer bidders' questions and issue addenda as necessary. <br />13. Attend bid opening. <br />14. Assist in contract award. <br />15. Review shop drawings. <br />16 Make three inspections, during construction, final and final follow- <br />up. <br />Fee for these services to be on an hourly rate basis, not to exceed $5.0011 <br />without further authorization. <br />A - I <br />