Laserfiche WebLink
COST ESTIMATE FOR M.S.A. PROJECT 1986 <br />CITY PROJECT 66-2 <br />PAGE TWO OF THREE <br />SAP I46-254 02 NON -PARTICIPATING TOTAL <br />_�- <br />ITEM I UNIT ANTI TY TOTAL <br />NC. <br />DESCRIPTION UNIT PRICE OUANTITT TOTAL WANTITr TOTAL W <br />16. 2501.515 INSTALL 15-1/2" • 12" <br />Rl, ARCH ArRGN WIT:, <br />, <br />f 55.00 <br />0 <br />S 0_00 <br />1 <br />S 55.00 <br />TRASH GUARD <br />EACH <br />S <br />55_00 <br />17. <br />2503.541 12- RC PIrE SEWER <br />A <br />S <br />0 <br />S 0.00 <br />6 <br />II160,00 <br />CLASS V <br />L.F, <br />S <br />20.00 <br />�60y00 <br />- <br />16. <br />25D6.509 CONSTPUCT CATCH <br />A <br />1 1,6AO,OG <br />0 <br />f n_pp <br />A <br />S 2,640.00 <br />BASINS, DESIGN K <br />EArH <br />S <br />666.00. <br />19. <br />/506.50; T C.•.T^' <br />i <br />f 750__00 <br />U <br />1 0yw <br />3 7af1, 60 <br />BASINS, DESIGN Y <br />EACH <br />1 <br />150.00 <br />f <br />IBO.OJ <br />5 <br />S 900.00 <br />O <br />S 0.00 <br />5 <br />S 900.00 <br />20. <br />7506.5I6 CASTING ASSEMBLIES <br />EACH <br />21 <br />,an6 a)7 AO.I+I$T FPAME AND <br />n <br />t 0_._DO <br />7 <br />t 59f.00' <br />• RING CASTING <br />EACH <br />S <br />65.00 <br />r <br />i ;i5.00 <br />22. <br />O504.602 ADJUST WATER <br />t 2A0.00 <br />0 <br />f Oy00 <br />A <br />S 240.00 <br />VALVE BOX <br />EACH <br />S <br />60.U0 <br />S <br />1.25 <br />450 <br />1 50 <br />0 <br />$ 0_00 <br />450 <br />f 562.50 <br />23. <br />7521.501 A" C)IaE,E WALK <br />5.F. <br />_)62- <br />24, <br />2531.501 CONCRETE CURB ANO <br />A,SLNS <br />1 19.350.00 <br />2,500 <br />S10,350.00 <br />6,600 <br />f 79,100.00 <br />GUTTER DESIGN (8616) <br />L.F. <br />f <br />4.50 <br />' <br />25. <br />2531.501 CONCRETE CROSS CJIB <br />A20 <br />f 3 276.00 <br />1B0 <br />f 1,A0A.;A <br />600 <br />S A,600.00 <br />AND GUTTER <br />L.F. <br />1- <br />7 <br />f__ <br />3_00 <br />100 <br />y 300,00 <br />0 <br />f OyDO <br />100 <br />S MOD <br />26. <br />2555.501 BITUMINOUS CURB <br />L.F. <br />S <br />1.10 <br />4,600 <br />S 5.060.00 <br />2.500 <br />S 2,750,00 <br />7,100 <br />S 7,010.DO <br />27, <br />1515.505 SW <br />SO.+D• <br />20. <br />2105.525 BLACK DIRT FROM <br />5B0 <br />S 7,280.00 <br />220 <br />S 1,320.00 <br />600 <br />f 3,600. <br />OFF SITE <br />CU.YO. <br />.t <br />6.000 <br />29. <br />2556.505 BITUMINOUS MATERIAL <br />S O.DO <br />37,300 <br />1 33.9A3.00 <br />37,500 <br />S 33,9A3. <br />FOR SEAL COAT <br />GAL. <br />S <br />_ .91 <br />0 <br />30. <br />235A.507 SEAL COAT AGGREGATE <br />1 0_00 <br />1,9A0 <br />f 26.925.A0 <br />1,9A0 <br />S I8,925.A0 <br />(FA-2) <br />TCH <br />1 <br />14,91 <br />0 <br />31, <br />2341.518 EXCAVATE F. A1(1 I, <br />0 <br />S 0_00 <br />4,600 <br />S 19%000 <br />.. <br />A600 <br />, <br />S 29,9OC.- <br />3" THICK PATCHING <br />SO.'10. <br />S_ <br />6.50 <br />y v ,+6A.5'1 SIOA,597,10 SIA_A ,760,90 <br />rAGF SIIRTOTAL -=- _ <br />