Laserfiche WebLink
i.✓4COS <br />1riiA1 <br />C.T EST; MATE FuR N. 1. A. PRUJELI IVM6 <br />CITY PIW7JFCT 86-2 <br />'F 7HRF[ M 116IFF <br />—" — <br />TEM <br />N0. DESCRIPTION --� UNIT <br />SAP N6-231-02 NON{'ART IC IPATING TOTAL <br />UNIT <br />-PRICF WAMTIT'. TOTAL 1 r QUANTITY TOTAL <br />IQUAN ITT TOTAL <br />32. 2531.501 CONCRETE MEDIAN L.F. 1 <br />11,00 150 _1.6'0.00 <br />0 S 0yy00 <br />ISO S 11650.00 <br />33. 05f5.601 REVISED FILL TRAFFIC <br />ACTUATED TRAFFIC <br />SIGNAL SYSTEM L.S. $17,000.00 1 S T7,000.00 <br />0 1 0_00 <br />1 S_17y000,00 <br />34. EXCAVATE, F. AND 1. ?- <br />THICK INSULATION nVER <br />EXISTING WATERMAIN L.F. 1 <br />15.00 0 S 0_00 <br />280 $ 4,200.00 <br />280 S 4,200.00 <br />35. REMOVE EXISTING 6- DIA. <br />CIP WATERNAIN MITI F. AM 1. <br />6' DIA. CLASS 52 DIP WITH <br />RESTRAINFD JOINTS AND FITTINGS <br />7-1/2" BELOW PROPOSED STREET <br />ELEVATION <br />L.F. 1 <br />18." 0 S O.oO <br />60 S 11080.00 <br />60 S 1,080,00 <br />PAGE SUBTUTAL <br />S 18,650.DO <br />S 5,280.00 <br />S 23,930.00 <br />ESTIMATED CONSTRUCTION COST <br />1167,369.50 <br />$1 0.116, 90 <br />S337,836.10 <br />COST r•-_i MNlt BY CITY OF FX)UM)5 MIEN <br />+PUBLIC WORKS CEPARTMF.NT <br />ESTIMATEO CONSTRUCTION COST SAP t12-231-02 <br />6187,389.50 <br />ESTIN.TED PRELIMINARY ENGINEERING <br />S 18,700.00 <br />ESTIMATED INSPECTION AND STAKING <br />S 11.900.DO <br />CONTINGENCY <br />S 18,700.00 <br />ESTIMATED TOTAL COST SAP 146-214-02 <br />$239,609.50 <br />USE <br />S210,000.00 <br />