Laserfiche WebLink
Ind f ,,, 'vfI'/ <br />COST ESTIMATE FOR M.S.A. PROJFi7 1966 <br />Llll 1'IP 11t Ll W-J <br />PAGE THREE UE THREE <br />_.__.___._..._.—.»_-------------- <br />- __----»—»..--_. ___..—--------- --.--__- SAP 146-234-02 NON -PARTICIPATING TOTAL <br />ITEM I RRIIT...... — - — <br />N0. DESCRIPTION UNIT PRICE QUANTITY TOTAL ODANTITY TOTAL 00AMTITI' TOTAL <br />-- -- - -- - �- --------L------ --L - -1- <br />52. 2531.501 COWC7M'TF MEO,AM L.F. 119.90 i50 2j365._00 0 S 0_00 150 1 2,385.00 <br />33. 0%5.604 REVISFO FULL TPAFYIC <br />ACTUATED TRAFFIC <br />SIGNAL SYSTEM L.S. 2/,SOO.DG <br />34. EXCAVATE, F. AND I. 7- <br />THICK INSULATION OVER <br />EXISTING WATETRMAI9 L.F. t 7.25 <br />55. REMOVE EFISTIING 6" DU. <br />CIP WATERMAIN AND F. AIEI 1, <br />6" DIA. CIASS 52 DIP WITH <br />RESTRAINED JOINTS AND FIITINGS <br />7-1/2• IIFLOW PROPOSED STREET <br />ELEVATION <br />L.F. f 35.00 <br />PAGE SUBTOTAL <br />ESTIMATED CONSTRUCTION COST BEFORE <br />STORM SEINER ADJUSTMENT <br />STORM SEWER 4JUSIMENT 116,72A.A , 1100 - 7t%11 <br />ESTIMATED CONSTRU^7I014 COST <br />I 1 21500.00 0 s 0_00 1 S 24, 500.00 <br />0 1 0.00 280 s 1,450.00 280 s 1,450.00 <br />t 0.00 60 1 2,100.00 60 1 _2,100_00 <br />1 26 ,665.00 S 3,530.00 s 30,435.00 <br />s191,299.40 5182,863.00 334,162.E0 <br />- 3,009.23 <br />1187,49C.17 <br />LUST ESTIMATE BY CITY CF MOLLOS VIEW <br />PUBLIC WORKS DEPARTMENT <br />ESTIMATED CONSTRUCTION COST SAP 146-234-02 <br />£STIM13TE0 PRELIMINARY ENGINEERING <br />ESTIMATED INSPECTION AND STAKING <br />CONY INGEIA:Y <br />ESTIMATED TOTAL COST SAP 146-234-02 <br />USE <br />MI,S.A. PAYS T9.10 OF THE COST OF TIRSE ITEMS <br />3,809.25 <br />1146,672.23 S334,162.40 <br />S 187 ,tl0.00 <br />s 16.700.00 <br />s 14,900.00 <br />t 18,700.00 <br />1239,790.00 <br />12E0,000.00 <br />