Laserfiche WebLink
ITEM <br />NO. DESCRIPTION <br />I. 2021.501 NMI I ZAT ION <br />2. 2104.501 REMDVF EX I STIAG <br />16" OW STORM <br />SEWER <br />3. 2105,501 000" EXCAVAT'ON <br />A. 2105.535 SALVAGEO TOP SOIL <br />FROM STOCKPILE <br />5, 2111.501 TEST ROLLING <br />6. 2112.501 SUBGRADE <br />PREPARAT-ON <br />+. 2211.501 AGGREGATE BASE <br />CLASS 5 <br />S. 2331.504 BITUMINOUS 7AATFR!AL <br />FOR MIXTURE <br />9. 235!.SI4 BASE LY1196F MIX, <br />I". 2341,50/ dITUMINOUS AIATERIAI <br />FOR MIXTURE <br />II. 2341.508 WEARING COURSE M,X. <br />12. 2357.502 BITUMINOUS MATERIAL <br />FOR TACK COAT <br />13. 2501.515 INSTALL IB' RC APRON <br />W/TRASH GUARD <br />IA. 2503.541 18" RC PIPE SEWER <br />CUSS V <br />15. 2503.541 13-1/2- v 22" ALCW <br />PIPE SEWER -CLASS V <br />N.S.A. MIFFT PROJECT 1986 <br />CITY OF MUNOS VIEW. NINIIESOIA <br />CITY PROJECT 06-2 <br />MAY IA, 1986 <br />ABSTRACT FOR THREE LOW BIOUERS <br />M10WFSF ASPHALT CO. VALLEY PAVING N 6 S ASPHALT <br />poT KkMTI TT <br />LINT <br />PRICE TOTAL <br />pJIT <br />PRICE _ TOTAL <br />UNIT <br />PRICE TOTAL <br />LUMP <br />1 <br />8. 500.Oc <br />8, 500.Oo <br />6,600.00 <br />6.800.0C <br />10,000.00 <br />10,000.00 <br />s;rL <br />L.P. <br />535 <br />1.70 <br />I,944.50 <br />2.75 <br />1,471.25 <br />2.65 <br />1,417.75 <br />C.Y. <br />9,700 <br />I 1.15 <br />16,975.00 <br />2.85 <br />27,645.00 <br />2.00 <br />19,400.00 <br />C.T. <br />200 <br />4.50 <br />9%.00 <br />3.00 <br />600.00 <br />4.50 <br />900.D0 <br />R.S. <br />32 <br />10.00. <br />5217.00 <br />10.00 <br />32n.00 <br />13.00 <br />416.00 <br />R.S. <br />32 <br />65.001 <br />1 <br />2,080.00 <br />105.00 <br />31360.00 <br />160.00 <br />51120.00 <br />TON <br />500 <br />6.75 <br />2,025.00 <br />7.00 <br />2,100.00 <br />6.00 <br />1,000.00 <br />1 <br />TON <br />I 190 <br />I50.00 <br />26,%0.00 <br />165.00 <br />31.350.00 <br />165.00 <br />31,350.00 <br />Tlw <br />I 4,0" <br />12.15 <br />49,734.40 <br />10.10 <br />A1, 5O9.00 <br />9.20 <br />3/,626-% <br />T(w I <br />BU <br />150.00 <br />12,000.00 <br />165.00 <br />13.200.00I <br />165.00 <br />13,100.00 <br />TON <br />1,350 <br />12.91 <br />17,4:8.50 <br />12.25 <br />16,537.50 <br />10.00 <br />13.500.00 <br />;AL. <br />1135C <br />1.20 <br />1,620.00 <br />1.15 <br />1, 552.50 <br />1.00 <br />11350.00 <br />'ACH <br />2 <br />510.00 <br />11020.00 <br />485.00 <br />970.00 <br />500.00 <br />1,000.00 <br />F. <br />ISO <br />28.65 <br />5,157.00 <br />29.00 <br />5,220.00 <br />28.00 <br />51040.00 <br />.F. <br />380 <br />35.00 <br />13,500.00 <br />35.00 <br />13,500.00 <br />34.00 <br />Ii,920.00 <br />PACE SUBTOTAL S 161,004.40 1 165,735.25 1 ISS,OA L15 <br />