My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1986/10/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1986
>
Agenda Packets - 1986/10/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:37:24 PM
Creation date
4/1/2025 2:37:24 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/27/1986
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C <br />W <br />L R. ANDERSON <br />rAd.... <br />A. R. BECKSTROM <br />Pmil..t <br />W. M. BP.ADIE <br />S. 7 <br />R. L ANDERSON <br />Ve rmw... <br />W. M. MILLER <br />T ... ' <br />R. L. ANDERSON-BECKSTROMt INC. <br />NIECIIANICAL CONTRACTORS <br />GENERAL OFFICE <br />M ROSE PLACE . ST. PAM MINNESOTA 65113 <br />r; <br />(614)638.4320 <br />September 25, 1986 <br />City of Mounds View <br />Director of Public Works and <br />Community Development <br />24U1 Hwy lU <br />Mounds View, MN 55112 <br />Attention: Mr. Steven Thacher <br />Re: Construction of Potassium <br />Permanganete Feed Equipment <br />for Well No. 3 at <br />Water Treatment Plant No. 1 <br />Dear Sir: <br />sFP,886 <br />city or <br />OUNDS VtEw <br />I have reviewed the specifications for the above project prepared by <br />Public Works Department, Mounds View, Minnesota dated July 1, 1986. <br />We hereby propose to provide all material, tools, skill, labor, insurance <br />necessary for the complete installation of this system as specified for _ <br />the sum of . . . . . . . . . . . . . . . . . . . . . . . . . $14,827.00. �— <br />it is our understanding that the in -line static mixer must be installed <br />during the hours noted in the specifications. <br />Exce tior.s to this Proposal: <br />—1. We have not included any extra costs for liquidated damages and we <br />would exclude any notations to liquidated damages in the contract. <br />2.) We have not included any electrical power wiring to interlock the <br />mixer pump with the well system. It is our understanding that an <br />electrical receptacle interlocked with the well pump is already <br />provided by the owner. <br />3.) We have not included any painting of piping or hangers. <br />�= — 4.) We have not included a performance bond. fil S ILA <br />
The URL can be used to link to this page
Your browser does not support the video tag.