My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1986/10/27
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1986
>
Agenda Packets - 1986/10/27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 2:37:24 PM
Creation date
4/1/2025 2:37:24 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/27/1986
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Donohue <br />October 21, 1986 <br />City of Moundsview <br />City Hall <br />2401 Highway No. 10 <br />St. Paul, Minnesota 55112 <br />Attention: Mr. Steve Thatcher <br />Public Works Director <br />Re: Proposal <br />Ditch Clean -out Project <br />Greenfield Park Area <br />Dear Mr. Thatcher: <br />We appreciate the opportunity to submit our proposal for <br />providing engineering services for your proposed ditch clean -out <br />project in the Greenfield Park area. We have prepared an outline <br />of scope and an estimated engineering cost for the project based <br />on hours per task and on our average hourly costs. We propose to <br />provide the services as outlined in the Scope of Services. <br />PROJECT DESCRIPTION <br />- This project includes the cleaning out and reshaping of the <br />existing storm water drainage ditch from Bona Road, through the <br />Greenfield Park area, to the Judicial Ditch at Sherwood Road. <br />The project will require clearing and the disposal of the <br />excavated material. <br />SCOPE OF SERVICES <br />The following is an outline of our understanding of the scope of <br />services for the project: <br />Preliminary Field Work - provide field alignment control, cross- <br />section existing ditch at approximately 100 foot intervals and <br />100 feet in width, obtain topographic data to defina clearing, <br />restoration, and other construction requirements. <br />Design, Preparation of Construction Plans - design project based <br />on original construction plans with 2:1 slopes (as presently <br />approved by the Rice Creek Watershed), evaluate alternate 4:1 or <br />5:1 side slopes, prepare plans for bidding and construction <br />purposes. <br />Donohue & Associates, Inc. <br />7200 Hemlock Lane North, Suite 200 <br />Maple Grove, Minnesota 55369 <br />Engineers & Architects <br />612.425-2181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.