Laserfiche WebLink
Mr. Steven Thatcher <br />October 20, 1986 <br />page Two <br />final trip is issued. Commencement of construction is defined as <br />anything which results in a continuous program of construction. <br />It includes, but I'; not limited to, installation of utilities, <br />site clearance, grading, and building. Since the Rule also <br />forbids "allowing construction to occur", the City of Mounds View <br />has an affirmative responsibility to retrain from insuing any <br />typntil the permit <br />andefromgensuringrthatlding permit constrructionudoes not commences inissued, <br />rading the <br />absence of a permit. <br />In addition, the City ofasohave severalwill <br />othermost <br />citieslikely <br />ineISPnamed <br />fbra <br />projects In on the a;pe of the <br />projects in their respective jurisdictions. Thepurpose <br />ISp is to ensure that traffic flow from the project does not lead <br />to a violation of air quality standards. The City of MoundsView <br />has the jurisdictioq to regulate the .traffic in acco�ance with <br />Lhe.requirements of -the ISP_so•that _a violation will be <br />prevented. If necessary, a third copermittee, such `as the <br />Minnesota Department of Transportation, will be added. under <br />Permission to included necessary copermittees is given <br />authority of Minn. Stat. section 116.07 subd. 4a (1984). <br />Should you have any questions, please call me at 296-7723. <br />If you need a formal written response, please write to me at our <br />new <br />address, <br />0tanyRoad, <br />concerns youlorMthe esota developersmight <br />illbeglad toaddress <br />have. <br />Sincerely, <br />Susanne M. Pelly, AICP <br />Senior Transportation Planner <br />Division of Air Quality <br />cc: J. David Thornton <br />John S. Seitz <br />