Laserfiche WebLink
MEMO TO: Clerk -Admini a trator and City Council <br />FROM: City Planner Herman <br />DATE: August 31, 1988 <br />SUBJECT: BUILDING E, MOUNDS VIEW BUSINESS PARK <br />Attached you will find a letter from Tim Nelson explaining <br />various changes to the site plan for Building E in the Mounds <br />View Business Park. The most obvious change is that the building <br />is set back from the north property line thirty (30) feet rather <br />than the ten (10) feet that was originally proposed. This is <br />because of a mistake in the survey of the building and the <br />subsequent construction of the building before this mistake was <br />noticed. The other changes to this site plan are to make up the <br />twenty (20) feet of differential in the original site plan from <br />the one that is currently proposed. Those items are 2 through 5 <br />in the letter. <br />Additional changes are found In Items A through D in the letter. <br />Item B is an additional driveway entrance and exit to Woodale. <br />Drive and is shown on the drawing. This issue his been reviewed <br />by the City Engineer and is found to be acceptable until such <br />time when the Robert Waste property becomes developed. Because <br />this entrance is proposed to be a street accessing Mr. Waste's <br />property, the future evaluation of this entrance is certain when <br />development occurs. This change will be contingent upon, future <br />review and is noted in the resolution approving the alterations <br />to the development agreement. <br />The site plan for Building E has been previously submitted to the <br />City Council in the Planning Commission packet for August 17th. <br />1 believe Tim Nelson of the Everest Group will be here to discuss <br />the proposed changes to both buildings E arid F. <br />KHJBAC <br />Attachment <br />L--1 <br />